Published June 12, 2025 at 8:00 PM

Updated June 13, 2025

Site work and paving for a bridge / tunnel in Park City, Utah. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

PCMC is inviting proposals from qualified persons or firms to provide construction and construction management services for the China Bridge Parking Structure Maintenance Project. The existing structure was constructed in two phases: the southern section in 1986 and the northern section 2006. In 2023, the City procured a consultant to complete a structural condition assessment because of visual signs of structural deficiencies. The structural condition assessment included recommendations for repairs and preservation activities. Questions Due Date Online Portal Deadline to submit Questions May 14th 2025, 12:00 PM MDT SCOPE OF WORK. Contractor shall furnish all labor, materials and equipment to complete the Project, consisting ofthe work described in the Information for Bidders as the Basic Bid, as specifically set out in the contract specifications, which is made a part hereof by reference. The Project will be bound by the specifications referenced herein, according to the Invitation for Bids, the Instructions for Bidders, the General Project Requirements and Specifications, the Bid of the Contractor, Bid Bond, Drawings, Notice of Award and Notice to Proceed (collectively referred to as the "Contract Documents"), all of which are incorporated herein by reference and on file in the Engineering Department. To the extent that this Agreement conflicts in any way with a proposed form agreement which may have been submitted as part of the bid specifications, this Agreement shall control. If any of the work performed by Contractor in any phase of the Project does not meet PCMC standards as outlined in the bid documents and specifications, then Contractor shall immediately repair or correct the work at no additional cost to PCMC. A. Subcontractors. No part of this Agreement shall be subcontracted by the Contractor without prior written approval by PCMC through the Project Manager/Engineer. The Contractor shall be fully responsible to PCMC for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by them as it is for the acts and omissions of persons directly employed by it Ifwritten approval is granted to subcontract a part ofthis Agreement, the Contractor shall require each subcontractor that physically performs services within Utah to submit an affidavit to the Contractor stating that the subcontractor has used E-Verify, or an equivalent program, to verify the employment status of each new employee.

Award

Bridges / Tunnels

$641,491.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
59
Bidding Soon
1,056
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

June 20, 2025

Project location map

Multiple Locations, Park City, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.