BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Site work for a power facility in Garland, Texas. Completed plans call for site work for a power facility.

**As of July 9, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** GP&L Oakland Transmission Line Rebuild. Question Deadline 05/27/2025 at 5:00 PM CT Mark Outside of Envelope: CSP 1074-25 Oakland Transmission Line Rebuild Construction Services Amount of Contract: $2,000,000.00 Project Location: The project is in Garland, TX. The project begins near the location of the existing transmission structure SHMC-20, which is near the intersection of S Shiloh Rd and Oakland St. The project will terminate at Oakland Substation, which is located on Oakland St west of the aforementioned intersection. Scope of Work: The scope of this project is a partial rebuild (loop-in, loop-out) of the existing Shiloh to McCree 138kV Transmission line. The rebuild begins at the existing SHMC-20 transmission line structure and ends at the Oakland Substation. This scope includes both Transmission and Distribution assets. Transmission Scope The transmission scope includes installing seven (7) steel singlecircuit full tension deadend structures, seven (7) steel singlecircuit line tangent structures and one (1) steel double-circuit line tangent/suspension structure. The deadend structures will utilize full length anchor bolts on drilled shaft foundations and direct embedded for the suspension structures, except for Shiloh-T2 and McCree-T1 which will utilize full length anchor bolts on drilled shaft foundations. The new standard 48 count fiber OPGW shall be installed from Oakland Substation up toward the new Shiloh SH1 and McCree SH1 structures, which will replace the existing SHMC-20 structure. The existing fiber ahead and back of new structures Shiloh SH1 and McCree SH1 shall remain and shall be transferred onto these new structures. New 3/8" OHGW to be installed from Shiloh T5 and McCree T5 to their respective terminal structures. The new transmission line structures were designed to support 1926.9 ACSS "Cumberland", which will be installed. Distribution Scope This project will also have a distribution component that is a requirement to be completed by the contractor. The distribution includes installing five (5) new wood structures and two (2) new custom steel pole structures. The wood distribution structures will be directly embedded following GP&L standard procedure, the custom steel pole structures will be installed on drilled piers. All new wood pole distribution structures shall be installed with new material as well as the transmission line underbuild portions. The distribution circuit will utilize the new 26-7 ACSR "Hawk" primary conductor and 6-1 ACSR "Penguin

Bid Results

Power Plant

$2,368,944.00

Public - City

Site Work

88

11

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
391
Active Projects
182
Bidding Soon
4,017
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

July 28, 2025

Project location map

To Be Determined, Garland, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.