Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published July 15, 2025 at 8:00 PM
Updated July 16, 2025
Site work for a power facility in Garland, Texas. Completed plans call for site work for a power facility.
**As of July 9, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** GP&L Oakland Transmission Line Rebuild. Question Deadline 05/27/2025 at 5:00 PM CT Mark Outside of Envelope: CSP 1074-25 Oakland Transmission Line Rebuild Construction Services Amount of Contract: $2,000,000.00 Project Location: The project is in Garland, TX. The project begins near the location of the existing transmission structure SHMC-20, which is near the intersection of S Shiloh Rd and Oakland St. The project will terminate at Oakland Substation, which is located on Oakland St west of the aforementioned intersection. Scope of Work: The scope of this project is a partial rebuild (loop-in, loop-out) of the existing Shiloh to McCree 138kV Transmission line. The rebuild begins at the existing SHMC-20 transmission line structure and ends at the Oakland Substation. This scope includes both Transmission and Distribution assets. Transmission Scope The transmission scope includes installing seven (7) steel singlecircuit full tension deadend structures, seven (7) steel singlecircuit line tangent structures and one (1) steel double-circuit line tangent/suspension structure. The deadend structures will utilize full length anchor bolts on drilled shaft foundations and direct embedded for the suspension structures, except for Shiloh-T2 and McCree-T1 which will utilize full length anchor bolts on drilled shaft foundations. The new standard 48 count fiber OPGW shall be installed from Oakland Substation up toward the new Shiloh SH1 and McCree SH1 structures, which will replace the existing SHMC-20 structure. The existing fiber ahead and back of new structures Shiloh SH1 and McCree SH1 shall remain and shall be transferred onto these new structures. New 3/8" OHGW to be installed from Shiloh T5 and McCree T5 to their respective terminal structures. The new transmission line structures were designed to support 1926.9 ACSS "Cumberland", which will be installed. Distribution Scope This project will also have a distribution component that is a requirement to be completed by the contractor. The distribution includes installing five (5) new wood structures and two (2) new custom steel pole structures. The wood distribution structures will be directly embedded following GP&L standard procedure, the custom steel pole structures will be installed on drilled piers. All new wood pole distribution structures shall be installed with new material as well as the transmission line underbuild portions. The distribution circuit will utilize the new 26-7 ACSR "Hawk" primary conductor and 6-1 ACSR "Penguin
Bid Results
Power Plant
$2,368,944.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2025
July 28, 2025
To Be Determined, Garland, TX
Related To This Project
Garland, TX
Bid Date: May 22 2025
Garland, TX
Bid Date: Dec 09 2025
Garland, TX
Bid Date: May 27 2025
Garland, TX
Bid Date: Jun 24 2025
Garland, TX
Bid Date: Jun 17 2025
Garland, TX
Bid Date: Feb 24 2026
Garland, TX
Bid Date: Jun 20 2025
Garland, TX
Bid Date: Jun 24 2025
Garland, TX
--
Garland, TX
Bid Date: May 20 2025
Garland, TX
Bid Date: May 15 2025
Garland, TX
--
Garland, TX
Bid Date: May 20 2025
Garland, TX
Bid Date: Jun 03 2025
Garland, TX
Bid Date: Jun 03 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed