BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Site work for a road / highway in Cedar City, Utah. Completed plans call for site work for a road / highway.

Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project. The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project: Project Description: Campus ADA and pedestrian improvements. Substantial Completion Date: August 22, 2025 Liquidated Damages: $500.00 per day Deadline to submit Questions May 16th 2025, 3:00 PM MDT Location online portal. SCOPE This section of the specifications cover specific requirements, instructions, and conditions applicable to this project only, which are not covered by the General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee. Should there be conflicting statements between this section and other sections of these specifications, this section shall govern. Should there be conflicting statements between the Standard General Conditions of the Construction Contract, these specifications or the Utah Division of Facilities Construction and Management (DFCM) Contractors Agreement the order of precedence is as follows: 1. DFCM Contractors Agreement. 2. These Specifications 3. Standard General Conditions of the Contract The following documents are required before a certificate of occupancy is issued: A code inspection report recommending that a certificate of occupancy be issued. Acknowledged Final report from the special inspection agency. Acknowledged Certificate of fire clearance from the State Fire Marshall. Acknowledged Final approval from the State Elevator inspector, if applicable. N/A Final approval from the State boiler inspector, if applicable. N/A Report of the disinfection of the potable water system. IPC 610. N/A A Certificate of Compliance from the approved fabricator, if applicable. IBC 1074.2.2. N/A A stamped and signed final report from the structural engineer when structural bservation is required by IBC 1710. N/A An NFRC Certificate for fenestration without the NFRC label. N/A Final report from the special inspector and the mechanical engineer when smoke control is required. The reports must comply with IBC 909.18.8.3. N/A Questions Deadline Friday, May 16, 2025 3:00 PM

Post-Bid

Roads / Highways

$3,500,000.00

Public - City

Site Work

16

10

19

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
7
Bidding Soon
164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

June 23, 2025

Project location map

1150 W 200 S, Cedar City, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.