BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2025 at 8:00 PM

Updated June 3, 2025

Site work and paving for a mixed-use development in Taylorville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Milling and overlayW Franklin StreetStfromS. ShumwaySt to S. Madison St,the reconstruction ofW Market StreetfromS. ShumwaySt to S. Madison St.The reconstructionofS. MadisonSt from W Market Street to W Franklin St,the reconstruction S. Simpson StfromW. Market St. to W Franklin St and the reconstructionofthe intersection ofW Franklin St and S. ShumwaySt Majoritems ofworkinclude aggregate base, type a,hotmixasphaltsurface removal,2"bituminous materials (prime/tackcoat), hot-mixasphaltbinder course,IL-19.0, N50, hot-mix asphaltsurface course, IL-9.5 mix N50, pavement removal,, combination curb &gutterremoval, inletremoval, inlets, typeAandvariousframe andgrates, combination concrete curb &gutter, type b-6.18,PCCsidewalk,sidewalk removal, pavement marking/striping, traffic control and protection and otherrelated work. A certified check orbank draft, payable to the order ofthe City of Taylorville, Illinois or a satisfactory bid bond executed by the Bidder and an acceptable Surety in an amount equal to ten percent (10%) of tiie total Bid shall be submitted with each Bid. The Qty ofTaylorville, Illinoisreservesthe right to reject anyor all bids, any or all bid items, and to waive anyand all irregularities orinformalitiesin the bids and/orbidding process and/orin the awardofbids. An award ofbid, if made,shall be made to the lowestresponsible and responsive bidder. BidsmaybeheldbytheCityofTaylorvilleforaperiodof 45 daysfrom the date ofdie opening ofBidsforthe purpose ofreviewing the Bids and investigating the qualifications ofBidders, priorto awardingofthe Contract Attention is called to the fret that not less than the minimum salaries and wages asrequiredby the Illinois PrevailingWageAct and by the Contract documents must be paid on this Project, and that the Contractor must ensure that employees and applicantsfor employment are not discriminated against because oftheir ofrace, creed, color, sex, religion, national origin, age, or physical ormental handicap, and that certain other requirements do apply since theContract ifawarded wifi beby a public governmental entity ***Prebid meeting: Discuss the Bidding Requirements Receive any questionsregarding the Plans, Specifications and Project in general. Visit the proposed construction site. Discuss EEO and Minimum Wage Ratesrequirements, ifnecessary.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
78
Bidding Soon
1,372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

June 30, 2025

Project location map

Multiple Locations, Taylorville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.