BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work for a bridge / tunnel in Webster Groves, Missouri. Completed plans call for site work for a bridge / tunnel.

Question Deadline 06/09/2025 The contractor questionnaire must be on file 7 days prior to bid opening. The proposed work includes the construction of a 82'-6.5'' long, single span, W33x169 Steel I-Girder bridge at 10 degree L.A. skew and 2% grade, All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the United States Department of Labor (Federal Wage Rates) and Missouri Department of Labor and Industrial Relations (State Wage Rates), whichever is higher. The Benton County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will no be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE Goal for this project is 4%. Doc note: Contractors desiring the Contract Documents for use in preparing bids may also obtain a set of such documents from Drexel Technologies: 10840 West 86th Street, Lenexa, KS 66214, telephone number is 913-371-4430. Bidding documents will be shipped only if the requesting party assumes responsibility for all related charge Corporate, certified, or cashier's checks shall be made payable to Drexel Technologies, Inc. Any questions regarding the project, plans, specifications, or bid documents should be directed to Aaron McVicker of McClure, 660-415-4007. The contract, if awarded, will be awarded to the lowest, responsive, responsible bidder complying with the Conditions of the Contract Documents within the Owner's budget. The Bidder to whom the awards are made will be notified at the earliest possible date. The Owner, however, reserves the right to reject any and all Bids and to waive any informality in Bids received whenever such rejection or waiver is in his interest.

Bid Results

Bridges / Tunnels

$679,338.00

Public - County

Site Work

23

12

3

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
10
Bidding Soon
1,059
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2025

July 16, 2025

Project location map

Gray Ave, Webster Groves, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.