BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2025 at 8:00 PM

Updated July 4, 2025

Site work and paving for a mixed-use development in Naperville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of June 10, 2025, this project has not yet been awarded. The contract is anticipated to be awarded at the end of this month. Sealed bids for the 2025 DuPage River Sports Complex Trail and Walkway Repaving. The scope of work includes repaving of the asphalt trail between the DuPage River Sports Complex ballfields, installation of buried downspouts, fence repair, landscape restoration, and other miscellaneous work for a complete project as shown in the Drawings and Specifications. Question Deadline 05/27/2025 at 1:00 PM CT All questions concerning this project or those concerning bidding requirements should be directed to Allan Barajas in writing to abarajas@napervilleparks.org. 1. A bid bond is not required for this project. 2. If a bid is accepted, a Surety Bond (aka Performance and Labor & Material Payment Bond), payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount will be required prior to beginning construction. A Surety Bond, payable to the Naperville Park District, for not less than one hundred (100%) percent of the contract amount is required by Statute prior to beginning construction on all projects where the Contract Sum is $150,000 or more, and may be required for projects $150,000 or less at the discretion of the Naperville Park District. Such bonds shall include the provision guaranteeing the faithful performance of the Prevailing Wage Act. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency. 3. If a bid is accepted, the Contractor will be required to file a written substance abuse prevention program with the Owner for the prevention of substance abuse among its employees prior to the commencement of the work. Said program shall be available to the general public. It is anticipated that the contract will be awarded in June. The Park District reserves the right to reject any non-responsive or non-responsible Bids or to reject all bids and waive any informality or technicality in any Bid in the interest of the Park District.

Award

Roads / Highways

$88,840.00

Public - City

Paving, Site Work

4

9

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
442
Active Projects
226
Bidding Soon
3,258
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

August 11, 2025

Project location map

2807 Washington St, Naperville, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.