BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2025 at 8:00 PM

Updated May 24, 2025

Site work for a civil project in San Antonio, Texas. Completed plans call for site work for a water / sewer project.

Stevens Ranch Water Main Project This project will be comprised of two parts, with plan sheets being separated into two volumes. The Stevens Ranch Water Main Project will be volume I of II. This project will install approximately 16,600 linear feet of 16 to 24-inch water main from the intersection of Stevens Circle and Stevens Pkwy to Talley Road. The Stevens Ranch Water Main Project is necessary to improve the reliability of SAWS' system and to provide service to the proposed Stevens Ranch Development. Construction will begin in the 1st quarter of 2026 with different starting and ending dates per segment that will be updated as construction proceeds. The total construction duration of the project is approximately 27-months. Open cut installation of approximately 16,000 linear feet of 16 to 24-inch diameter ductile iron water main at various depths up to 15 feet. Trenchless installation of approximately 600 linear feet of 24-inch diameter ductile iron water main within a 42-inch steel casing at various depths up to 10 feet. Installation and tie-ins/shutdowns will require coordination with the landowners and customers in the project area. ASR Pipeline Cathodic Replacement Project The ASR Pipeline Cathodic Replacement Project will be volume II of the two-part project. The Aquifer Storage and Recovery (ASR) pipeline supplies water to SAWS customers along the eastern half of the city. It delivers water from H2Oaks to the Artesia, Seale, and Randolph pump stations. The pipeline also has the ability to send water back to H2Oaks for recharge into the ASR system. This project consists of replacing the cathodic protection system that protects ASR pipeline Segments 4, 5, and 6 - 47,116 linear feet of 60-inch, 25,163 linear feet of 42-inch, and 4,460 linear feet of 24-inch steel pipelines with an impressed current cathodic protection system. The improvements implemented under this project will protect the pipeline against corrosion and enhance the longevity of this pipeline. Construction will begin in the 1st quarter of 2026 with different starting and ending dates per segment that will be updated as construction proceeds. The total construction duration of the project is approximately 27-months Installation of three new cathodic protection rectifier stations. Installation of an AC mitigation system along a portion of ASR Pipeline Segment 5. Three deep well 10-inch diameter anode beds with depths up to 190 feet. Increased vehicular traffic, dust, and noise is anticipated in the vicinity during construction activities. Construction activities will be scheduled to minimize service disruptions to customers. For more information: Stephen Muniz Contract Administrator San Antonio Water System Stephen.Muniz@saws.org 210-233-2950

GC Bidding

Water / Sewer

$17,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
41
Bidding Soon
2,267
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2026

January 2, 2026

Project location map

Stephens Ranch, San Antonio, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.