BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 23, 2025 at 8:00 PM

Updated June 24, 2025

Site work for a water / sewer project in Pueblo, Colorado. Completed plans call for site work for a water / sewer project.

**As of June 23,2025 the project was awarded to RUSS GRADING EXCAVATING LLC CO, with an awarded amount $2,587,345.17.** Any Request for Qualifications for Water Main Replacement Contract must be submitted to Matthew C. Trujillo, Director of Operations for evaluation by Pueblo Water no later than 3:30 P.M. on Wednesday, May 21, 2025. Install approximately 7,300 lineal feet of six-inch through eight-inch diameter water mains and appurtenances for renewal on Radcliff Lane, Regis Lane, Clemson Drive, Lehigh Avenue, and Stanford Avenue. Reference Number 0000387606 Purchase Type: Term: 06/23/2025 02:00 AM EDT - 09/30/2025 02:00 AM EDT Please see attached specifications and drawings for the City Wide Main Renewals 2025, Project No. Project is to Install approximately 7,300 lineal feet of six-inch through eight-inch diameter water mains and appurtenances for renewal on Radcliff Lane, Regis Lane, Clemson Drive, Lehigh Avenue, and Stanford Avenue. ALTERNATE #1 An add alternate to the base bid will be received to include the installation of an additional 1,703 lineal feet of six-inch and eight-inch diameter water main and appurtenances for renewal on Lehigh Avenue. ALTERNATE #2 An add alternate to the base bid will be received to include the installation of an additional 532 lineal feet of eight-inch diameter water main and appurtenances for renewal on Clemson Drive. Pueblo Water will furnish all PVC pipe, valves, fire hydrants, appurtenant fittings, and service line materials. All bedding, backfill, and surface replacement materials shall be furnished by the Contractor. Question Deadline 05/30/2025 at 12:00 PM MT Questions are submitted online Yes PERIOD FOR COMPLETION: Pueblo Water will award the contract by June 17, 2025. The completion of the total contract is required by November 21, 2025. Buyer Preferences, Guidelines & Requirements General Requirements - FOB Destination - Insurance Required - License Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % Each bid must be accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid amount. Any bid submitted after the time and date specified will not be considered. Pueblo Water reserves the right to reject any and all bids, or to accept that bid or proposal which in their opinion best serves the interest of Pueblo Water.

Award

Water / Sewer

$2,587,345.00

Public - City

Site Work

14

4

6

5

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
0
Bidding Soon
185
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2025

June 17, 2025

Project location map

Multiple Locations, Pueblo, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.