Site work for a water / sewer project in Winters, Texas. Working plans call for site work for a water / sewer project.

As of September 09, 2025, bids received were rejected. No definite date for the rebid. The City of Waco has issued this solicitation for the Emergency (Water and Wastewater) Standby Generator Installation Project. The project generally consists of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place generator installations at the Riverside Water Treatment Plant High Service Pump station, Riverside Administration Building, Riverside Operations Building, and the WMARSS Wastewater Treatment Plant-South Plant Location. Installations include all necessary electrical and civil site improvements and components as shown on the project drawings and as specified herein. Questions Due Date: Jun 11th 2025, 5:00 PM CDT Online Portal Tentatively, the final selection decision will be made, and submitters will be notified of award by, August 1, 2025. This schedule is subject to change by the City Duration of Services The City of Waco is seeking to have the work that is the subject of this RFB completed to Substantial Completion within 270 Calendar Days from the date of the Notice to Proceed and to Final Completion within 300 Calendar Days from the date of the Notice to Proceed. In determining the number of days for completion of the work under this Contract, it is anticipated that work will not be performed on Saturdays, Sundays, or City holidays unless specifically approved by City. Since "day" is defined as a calendar day, Saturdays, Sundays, and City holidays shall be counted as days and included in calculating the Contract time. If a Contractor wants to perform work on Saturdays, Sundays, or City holidays, the Contractor shall seek approval by making a written request to City. The contractor shall be responsible for all City staff and third party time, costs, expenses, and overtime for work Performed on Saturdays, Sundays, or City holidays, unless excused in writing by the City prior to the work.

Final Planning

Water / Sewer

$400,000.00

Public - City

Site Work

80

23

6

11

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
23
Bidding Soon
200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

March 9, 2026

Project location map

Multiple Locations, Winters, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.