Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 23, 2025 at 8:00 PM
Updated June 24, 2025
Site work for a water / sewer project in Brighton, Illinois. Completed plans call for site work for a water / sewer project.
Village of Brighton is requesting Bids for the construction of the following Project: Water System Improvements. The Project includes the following Work: To replace approximately 30,000 L of various 4-inch through 8-inch PVC water main and appurtenances. Document info : Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Cost does not include shipping charges. Upon Issuing Office's receipt of payment printed Bidding Documents will be sent via UPS delivery service. The shipping charge amount will be $10.00. Bidding Documents are available for purchase in the following formats: Bidding documents ( including full-size drawings) includes registration as plan holder $100.00 . Bidding documents ( including Half-size drawings) includes registration as plan holder $80.00. Electronic download of bidding douments from online as plan holder free $10.00 Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Domestic Preference This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, 70901-70953. Absent an approved waiver, ail iron, steel, manufactured products, and construction materials used in this project must be produced in the United States.\ The following waivers apply to this Contract: BABAA De Minimis, Small Grants, and Minor Components The Project includes the following Work: To replace approximately 30,000 LF of various 4-inch through 8-inch PVC water main and appurtenances. Question Deadline 06/11/2025Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Seth Elliott: Submit questions via email to swelliott@heneghanassoc.com
Bid Results
Water / Sewer
$5,542,553.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2025
September 30, 2025
Multiple Locations, Brighton, IL
Related To This Project
Brighton, IL
Bid Date: Sep 29 2025
Brighton, IL
Bid Date: Nov 14 2023
Brighton, IL
Bid Date: Mar 01 2022
Brighton, IL
Bid Date: Mar 01 2022
Brighton, IL
Bid Date: Oct 11 2023
Brighton, IL
Bid Date: Jun 05 2023
Brighton, IL
Bid Date: Mar 22 2023
Brighton, IL
Bid Date: Feb 16 2023
Brighton, IL
Bid Date: Jan 25 2023
Brighton, IL
Bid Date: Jun 03 2022
Brighton, IL
Bid Date: Apr 28 2022
Brighton, IL
Bid Date: Jan 20 2023
Darien, IL
Bid Date: Jun 11 2025
Lake Forest, IL
Bid Date: May 30 2025
Rockford, IL
Bid Date: Jul 02 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
