BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Renovation of an educational facility in Plano, Texas. Completed plans call for the renovation of a educational facility.

Plano Independent School District is requesting Competitive Sealed Proposals for: Shepton High School Elevator Replacement SCOPE OF WORK: This project includes upgrading the existing elevator system, along with electrical and lighting renovations to enhance safety and accessibility for students, staff, and visitors. Removal of Existing Elevator, Removal of existing hoistway doors, door frames and door sills and Installation (01) New Hole-less Hydraulic Telescoping Twin Piston Passenger Elevator, new 42 in center opening hoistway door panels, door frames and aluminum door sill. Approved Non- Proprietary Elevator Manufacturers for this Project are: 1) Schumacher, Denver, IA 2) American Crescent Elevator, Picayune, MS. 3) Alliance Elevator Company, Greencastle, PA. 3) Canton Elevator Company, North Canton, OH. The estimated budget and Location: Estimated Budget- $195,000 Owner's Contingency - $12,000 Address - 5505 W Plano Pkwy, Plano, TX 75093 Question Deadline 05/30/2025 at 4:00 PM CT . CONTRACT TIME: (215) days to complete the Installation Work: August 10, 2025 to March 11, 2026 Alternate 1: Removal of Existing Elevator including existing hoistway doors, door frames and door sills. Installation of (1) Traction MRL Elevator. Elevator Pit to be excavated for 5 ft. pit depth including 16 in. sump pump hole in the rear left corner adjacent to existing machine room. Provide main line disconnect at the top of the hoistway approximately 24 inches above the 2nd floor header, fuse size in accordance with the Elevator Contractor's requirements. Install 110v 20 amp disconnect at the top of the hoistway approximately 24 inches above the 2ndfloor header. Install at the top of the hoistway, (2) 4 ft. LED light fixtures to illuminate drive machine and hoistway. Top of hoistway lighting to have a switch 48 inches on left hoistway wall approximately 12 inches from from the front hoistway wall. Lighting circuit to be separate from the car lighting. The hoist beam at the top of the hoistway should be approximately 15 ft. above the 1 st floor landing sill, mounted side to side center of the hoistway. Hoistway measures 8 ft. 3 1/2 in. side to side. (2) Hoist beams to installed in hoistway to withstand 7,500 lbs. Smoke detector shall be installed at the top of the hoistway within 24 inches of the installed gearless drive machine. Rail bracket inserts to be mounted in the hoistway in accordance with the Elevator Contractors drawing

Award

Educational

$169,371.00

Public - City

Renovation

6

15

2

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
330
Active Projects
43
Bidding Soon
4,024
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.