Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 5, 2025 at 8:00 PM
Updated June 6, 2025
Site work for a fire / police facility in Defiance, Missouri. Completed plans call for site work for a fire / police facility.
Firing Range Monument Sign - The St. Charles County Facilities Management Department is seeking bids to design, fabricate, and install a single-sided monument sign at the County Firing Range located at 1835 S. Hwy 94 Defiance, Mo 63341. The signage will adorn a St. Charles County Police Department emblem and lettering, "Sgt. John C. Bush Firearms Training Center". The County has a dedication ceremony planned on July 1st and the new sign will need to be in place for the dedication. Monument Sign Scope: The existing sign will be removed by the owner. Existing electric is onsite. Contractor to provide lighting requirements for signage. Owner to bring electric to sign for final termination by Contractor. Contractor shall submit drawings for permit, County to pay permit fees directly. Contractor to design footing & foundation. Proposals should include a recommendation for how the sign should be oriented upon the proposed property that will meet the intent of the goal of being visible from both lanes of traffic. Contractor to design and fabricate stone base and stone cap. 1. One natural stone clad rectangular base (min. 12" wide) with top cap installed over the sign. 2. Stone shall be dimensional natural limestone or equivalent, mortared to match. Contractor to design and fabricate signage 1. Sign shall be single sided. The badge and name shall be displayed on the signage, visible to (the roadway). 2. High Density Urethane (HDU) board signage or equivalent with raised lettering and badge emblem. 3. Approximately 10' sign span, 4' tall. 4. Left portion of sign shall be predominantly displayed and incorporate the St. Charles County Police Badge Emblem. 5. Right portion of signage shall be prominently displayed and read, "St. Charles County Police Department Sgt. John C. Bush Firearms Training Center." 6. The sign must be able to withstand heavy rain, hail, snow, intense sunlight and high winds and other hazardous weather conditions. 7. The monument sign must meet setbacks as established by the Missouri Department of Transportation. Contractor to design signage lighting. 1. Lighting shall be sign mounted or integrated. Sign must be visible and readable from the roadway. Lighting shall not be placed on grade or in the grass. 2. The proposal should include power requirements that will need to be supplied within five feet of the sign. Contractor to provide Installation. 1. Owner will provide footing/foundation based off Contractor design. 2. Contractor to fabricate and install stone base on top of County provided footing/foundation. 3. Contractor to fabricate and install signage with top cap. 4. Owner will provide electric to signage location based off lighting requirements. 5. Contractor shall terminate electrical wires to signage lighting. Alternate 1: Supply and install CMU block that matches the existing building in lieu of stone base. Any questions or clarifications concerning this Request for Bid must be submitted in writing via E-mail (preferred), mail or fax to: Donna Clayton Finance Department, St. Charles County Government 201 North Second St St. Charles, Missouri 63301 Fax: (636)949-3870 dclayton@sccmo.org For questions or inquiries concerning the specifications please contact: Brian Cox, Project Manager Facilities Management Department, St Charles County Government 300 North Second St, Room 101 St. Charles, Missouri 63301 bcox@sccmo.org All questions must be received no later than 2:00 PM on 5/22/2025. Any question received after this deadline may not be answered.
Bid Results
Fire / Police
$37,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2025
June 27, 2025
1835 S Missouri 94, Defiance, MO
Related To This Project
Defiance, MO
Bid Date: Jan 06 2026
Defiance, MO
Bid Date: Jun 17 2025
Defiance, MO
Bid Date: Apr 29 2025
Defiance, MO
Bid Date: Feb 04 2025
Defiance, MO
Bid Date: Feb 19 2025
Defiance, MO
Bid Date: Sep 24 2024
Defiance, MO
Bid Date: Aug 23 2024
Defiance, MO
Bid Date: Apr 19 2024
Defiance, MO
--
Defiance, MO
Bid Date: Mar 13 2025
Defiance, MO
Bid Date: May 10 2023
Defiance, MO
Bid Date: Jul 29 2022
Defiance, MO
Bid Date: Dec 29 2022
Joplin, MO
Bid Date: Jun 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
