BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Site work and asbestos abatement for a multi-residential development in Cortland, New York. Completed plans call for site work for a multi-residential development; and for asbestos abatement for a multi-residential development.

Questions about the project may be directed at Robert Thayer, Building Maintenance Supervisor at 607-753-1771, ext. 226. The owner accepts the right to accept or reject all bids and to waive any informalities in the bidding process. MBE/WBE/MWBE & Section 3 businesses are welcome. Scope of work: 1) Remove existing VCT flooring, flooring adhesive, and vinyl cove base in an approximately (2) 500 sq. ft. one bedroom apartment. a) Portions ofthe tile and adhesive have tested positive for asbestos in similar apartments within the building. b) The flooring to be removed is in apartment # 112 & 801 at 42 Church St. Cortland, NY 2)The abatement contractor shall provide: a) Safe removal of designated floor tile, tile adhesive, vinyl cove base and landfill disposal removed materials from said apartments. b) The apartment floor will be taken down to the original concrete as practical. c) The contractor will exercise due diligence to follow all federal state and local laws, regulation rules and ordinances that apply to this abatement. d) Apply proper safety measures to protect workers and CHA residents and staff. e) Install plastic tent /barriers around the workplace. Pull and maintain negative air on the work site as required. f) Clean up ofwork site and proper disposal of all materials. Maintain proper signage for the project. g) Copies of all documentation completed by the contractor must be provided to CHA. 3) The contractor will work with the asbestos monitoring and the air sampling contractor hired by CHA to meet the required sampling plans. 4) The contractor will carry a current license for Asbestos abatement for the state of New York and provide a copy to CHA. 5) All work is to be completed between the hours of 0700 and 1800 hrs. Monday-Friday. The job timeline is 30 days. Start and stop dates will be provided by CHA

Award

Multi-Residential

$17,231.00

Public - City

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
138
Bidding Soon
1,489
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2025

July 21, 2025

Project location map

Multiple Locations, Cortland, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.