BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2025 at 8:00 PM

Updated June 12, 2025

Site work and paving for a road / highway in Green Bay, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Asphalt Repairs to Walkway at New Zoo M/WBE's are encouraged to participate in the bid process. RFB Questions Due: June 2, 2025, by 3:00pm General: To replace portion of asphalt/brick walkway (Gate Z1 to VC/Penguin overlook/Lion habitat) with new asphalt pavement. Requirements: o labor, materials, and equipment to remove and dispose of existing asphalt and bricks (approx. 900 SY). o Excavate and place 10" stone base in an area of approximately 40 SY to eliminate interior landscape area. o Fine grade, water and compact the existing base in an area of approximately 900 SY in the asphalt and brick area of the trail. o Construct a single-course 2" compacted average depth asphalt pavement on an area of approximately 900 SY to repave the asphalt and brick portion of the trail. o Perform landscape restoration adjacent to the new asphalt including grading, seeding, and maintaining erosion control measures until turf is established. o Contractor is responsible for proper erosion control measures during project. o Contractor is responsible for blocking off and signing work area to ensure no accidental public access. o Contractor is responsible for cleaning roadways/walkways of mud/dust/debris generated during project. o Contractor must coordinate with Zoo staff to perform work between the hours of 7am - 7pm o Project is to be completed in 2025

Post-Bid

Roads / Highways

$300,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
33
Bidding Soon
453
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

July 10, 2025

Project location map

4378 Reforestation Rd, Green Bay, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.