BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Site work, paving and outdoor lighting for a mixed-use development in Glendale, Arizona. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000395929 the work described herein: Construction of roadway improvements for Northern Parkway: Agua Fria River to 103rd Ave, including new pavement, sidewalks, medians, traffic signal upgrades, lighting, signing and striping. This is a federally funded project and subject to Davis Bacon wage requirements. Bonding Requirements - Surety Bond 10 % Each bid must be accompanied by a Surety Bond, cashier's or certified check or postal money order equal to 10 percent of the bid, made payable to the Treasurer of Maricopa County as a guarantee that if the work is awarded to the bidder; the bidder will, within ten (10) days from the date of Notice of Award, enter into proper contract and bond condition for the faithful performance of the work, otherwise said amount will be forfeited to the Board of Supervisors as liquidated damages. All construction work on this contract is to be completed within 365 CALENDAR DAYS beginning with the date specified in the Notice to Proceed. Exclusive of and following the contract time allowed for construction work are 120 CALENDAR DAYS for internal administrative purposes thereby resulting in a total contract performance period of 485 CALENDAR DAYS. Question Deadline 09/22/2025 at 6:00 PM MT Inquiries may be submitted by telephone to the procurement officer for the solicitation but must be followed up in writing for the answer to be binding. No oral communication is binding on Maricopa County For this contract, a DBE goal of 7.69% is established for Disadvantaged Business Enterprises. Question Deadline 09/22/2025 at 6:00 PM MT Questions are submitted online Yes Direct all inquiries to: Paul Shamrock Article V Procurement Officer (602) 506-6476 Email: Paul.Shamrock@maricopa.g Questions or clarifications regarding the bid documents shall be addressed through BidNet Direct using the link in the "Q&A"tab. Minor administrative questions may be sent to Paul Shamrock, Article 5 Procurement Officer at Paul.Shamrock@maricopa.gov 250051-DBB, 2025-033, C-64-25-087-X-00 The work under this section shall consist of furnishing and installing Electrical Service Pedestal System, Battery Backup System, Controller Cabinet Assembly in accordance with the location and type designated on the plans, following City of Peoria standard details, the requirements of these specifications and requirements from SRP or APS, as indicated on the plans. Signal equipment for the 107th Avenue and Northern Avenue intersection shall be to City of Peoria Standards. The general Project is located along the existing Northern Avenue alignment from the Agua Fria Bridge to approximately 400 feet east of the intersection with 99 th Avenue, with an additional segment later added along 107 th Avenue from Northern Avenue to Orangewood Avenue. Collectively the Project Area is located within the cities of Glendale and Peoria, and unincorporated areas of Maricopa County (Figure 2). The Project Area along Northern Avenue varies from 50 feet to 225 feet centered on the section line. It is anticipated that new ROW will be required to implement the anticipated scope of work, including land developed for residential, commercial, industrial, agricultural and municipal uses. The scope of work for the project will consist of: Constructing additional travel lanes in each direction with a center raised median along Northern Avenue. The final roadway section would consist of six to eight through travel lanes with a median separating eastbound and westbound traffic. Constructing a new bridge across New River to accommodate the eastbound travel lanes. Reconfiguring the existing New River bridge to accommodate additional westbound travel lanes. Constructing Augusta Avenue from 108 th Avenue to 107 th Avenue to provide access to Country Meadows II Condominiums. Augusta Avenue would consist of one 16-foot lane and curb and gutter in each direction. An attached 5-foot sidewalk will be provided on the north side of the road. Extending Orangewood Avenue from 107 th Avenue to Glen Harbor Boulevard. Orangewood Avenue would consist of two 12-foot lanes and curb and gutter in each direction. Constructing new sidewalks where they currently do not exist. Striping crosswalks at signalized intersections. Constructing a shared use path area on the bridge across the New River. Converting the intersection of 111 th Avenue to a signalized intersection. Improving intersections by adding medians, dual and single left turn lanes, additional turn lane storage length, pocket right-turn lanes, and improved pedestrian crossings. Project no- 2025-033, C-64-25-087-X-00

Bid Results

Roads / Highways

$443,193.00

Public - County

Outdoor Lighting, Paving, Site Work

91

15

67

7

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
2
Bidding Soon
659
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

December 1, 2025

Project location map

Northern Pkwy, Glendale, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.