Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 27, 2025 at 8:00 PM
Updated June 28, 2025
Renovation of a medical facility in Long Beach, Mississippi. Completed plans call for the renovation of a medical facility.
Questions should be directed to the Professional. Should a Bidder find discrepancies in, or omissions from, the procurement documents, or be in doubt as to their meaning, the Bidder should immediately notify the Professional. The Professional will send written instruction(s) or interpretation(s) to all known holders of the documents. Neither the Owner, nor the Professional, will be responsible for any oral instruction or interpretation. Campus Generator Improvements. A. Work Covered: Work covered by the Contract Documentsis as shown in drawings and described in wordsin the Project Manual. The Project Title and location is indicated on the first page of this Project Manual. B. Start of Work: Work shall be started immediately upon issuance of a Notice to Proceed. Prior to this, all Contracts and beginning documents will have been executed and insurance in force. C. Time of Completion: The completion of this Work is to be on, or before, the time indicated in the Standard Form of Agreement Between the Owner and the Contractor. D. Contractor's Duties: 1. Except as specifically noted, provide and pay for: a. Labor, materials and equipment. b. Tools, construction equipment and machinery. c. Water, heat and utilities required for construction. d. Other facilities and services necessary for proper execution and completion of the Work. 2. Pay legally required sales, consumer, use, payroll, privilege and other taxes. 3. Secure and pay for, as necessary for proper execution and completion of work, and as applicable at the time of the receipt of the bids: a. Permits. b. Government fees. c. Licenses. 4. Give required notices. 5. Comply with codes, ordinances, rules, regulations, orders and other legal requirements of public authorities which bear on performance of work. 6. Promptly submit written notice to Professional of observed variance of Contract Documents from legal requirements. It is not the Contractor's responsibility to make certain that drawings and specifications comply with codes and regulations. Appropriate modifications to Contract Documents will adjust necessary changes. Assume responsibility for work known to be contrary to such requirements, without notice. 7. Enforce strict discipline and good order among employees. Do not employ or work unfit persons, or persons, not skilled in assigned task. 8. Provide a written safety plan. E. Hazardous Materials: The Prime General Contractor is responsible for the removal and disposal of any hazardous materials encountered in the performance of the Contract requirements. Hazardous Containing Materials[HCM] include, but are not limited to, Asbestos and Lead Paint and should be identified and removed as a part of the Contract. The absence of details does not relieve the Prime General Contractor from the responsibility of removal and disposal; but, a Change Order could be executed in the absence of identified HCM in the documents. F. Coordination: The Prime General Contractor isresponsible for the coordination of the total project. All other Contractors and all Subcontractors will cooperate with the Prime General Contractor so as to facilitate the general progress of the Work. Each trade shall afford all other trades every reasonable opportunity for the installation of their work. Refer to Section 01 3100 entitled Project Coordination. The Bureau of Building, Grounds and Real Property Management reserves the right to waive irregularities and to reject any or all bids.
Bid Results
Medical
$489,900.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2025
July 28, 2025
1170 W Railroad St, Long Beach, MS
Related To This Project
Long Beach, MS
Bid Date: Jul 29 2025
Long Beach, MS
Bid Date: Jun 17 2025
Long Beach, MS
Bid Date: Jun 17 2025
Long Beach, MS
Bid Date: Jun 10 2025
Long Beach, MS
Bid Date: May 27 2025
Long Beach, MS
Bid Date: May 27 2025
Long Beach, MS
Bid Date: May 06 2025
Long Beach, MS
Bid Date: May 13 2025
Long Beach, MS
Bid Date: May 13 2025
Long Beach, MS
Bid Date: Apr 01 2025
Long Beach, MS
Bid Date: Jan 07 2025
Long Beach, MS
Bid Date: Dec 17 2024
Long Beach, MS
Bid Date: Dec 10 2024
Long Beach, MS
Bid Date: Nov 18 2024
Long Beach, MS
Bid Date: Nov 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
