Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 6, 2026 at 7:00 PM
Updated March 7, 2026
Site work for a water / sewer project in Columbia, South Carolina. Working plans call for site work for a water / sewer project.
Project has been cancelled Question Deadline 06/30/2025 at 12:00 PM ET Questions must be submitted to: (eBidcolumbiasc). Using eBidcolumbiasc, the user must be logged in, and under the Bid tab, select "Bid Questions and Answers." The City will not accept telephone calls or visits regarding this solicitation. No interpretation shall be binding unless in writing from the City of Columbia. This Project consists of retrofitting an existing dry stormwater detention basin into a wet retention basin with additional stormwater management volume. The project also includes removal of existing chain link fencing, trees, vegetation and accumulated debris. In addition to the pond grading, the project includes installation of new fencing, pond control structure and revegetation of the project. The pond site is in a residential neighborhood located adjacent to the Southern Railroad and Louisa Street. St. Louis Court and Windwood Place cul-de-sacs are adjacent to the work area. The existing facility is a dry pond and does not meet the City's water quality standards and does not provide quantity management. Currently the pond is not connected to the storm sewer infrastructure of the nearby neighborhoods as it was disconnected at some point in the last half century. Work called for consists of furnishing and installing equipment, materials, labor, etc. as needed for a complete and proper installation of the proposed improvements in accordance with the plans and specifications. To accommodate the stormwater pond retrofit, a sanitary sewer line will be required to be relocated. The proposed sewer relocation requires furnishing and installing equipment, materials, labor, etc. as needed for a complete and proper installation of the proposed sewer line in accordance with the plans and specifications. Louisa Street Stormwater Pond Retrofit and Sewer Replacement
Final Planning
Water / Sewer
$2,750,721.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2025
April 14, 2026
Louisa St, Columbia, SC
Related To This Project
Columbia, SC
Bid Date: May 27 2025
Columbia, SC
Bid Date: Jun 26 2025
Columbia, SC
Bid Date: Jun 19 2025
Columbia, SC
Bid Date: Jun 17 2025
Columbia, SC
Bid Date: Jul 03 2025
Columbia, SC
Bid Date: Sep 15 2025
Columbia, SC
Bid Date: Jul 08 2025
Columbia, SC
--
Columbia, SC
Bid Date: Jun 05 2025
Columbia, SC
--
Columbia, SC
Bid Date: Jun 20 2025
Columbia, SC
Bid Date: Jun 20 2025
Columbia, SC
--
Columbia, SC
Bid Date: May 29 2025
Columbia, SC
Bid Date: May 27 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
