Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work and new construction of a civil project in Foam Lake, Saskatchewan. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The New Water Treatment Plant-Phase 2 component upgrades include the membrane system process piping, electrical and control. Supplying and installing two train membrane systems and distribution pumping systems. - Supplying and installing all piping and valves. - Supplying and installing HVAC systems. - Supplying and installing truck fill and bottle fill systems including controls. Documents are available at www.sasktenders.ca

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

New Construction, Site Work

12

16

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
42
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

July 14, 2025

Project location map

SK-16, Foam Lake, SK

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed