BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2025 at 8:00 PM

Updated June 17, 2025

This is a service / maintenance or supply contract in Edmonton, Alberta. Contact the soliciting agency for additional information.

A comprehensive Infrastructure Development Plan (IDP) for the development of initial infrastructure to provide vehicle and pedestrian access within Big Island Provincial Park (BIPP). Alberta Parks defines an IDP as a capital planning document that includes a needs assessment, defines programming requirements, proposes options for development recommendations and presents implementation strategies for infrastructure within a targeted area of a designated Facility Zone on Alberta's Crown Land. Provisional Phase: Based on the comprehensive IDP the consultant will complete further Assessments, Conceptual Design, Detailed Design, Approval Process, Issued for Tender and Issued for Construction and Project Close Out phases for the site to achieve the end result desired by the province for the initial phase of construction. The work to be accomplished under this project is visioned as 2 - part: Part 1: To complete capital infrastructure development planning exercises to support interim development to provide safe and easy access to Big Island Provincial Park (BIPP). More specifically, this includes: Entry from 199 Street to park. Access road to provide vehicle visitor access to BIPP top of bank. Create parking area off access road with approximately 30-50 stalls and amenities including vault toilet, trash/recycle bins, signage, etc. Minor trail improvements to access river valley and crossing location to the Big Island. Create a formal crossing structure to cross the flood/wet area to access Big Island. Add signage using Alberta Parks standard sign and catalogue as needed. .6 Increase accessibility wherever reasonably possible. Following completion and approval by internal decision-makers, these deliverables will guide detailed design and infrastructure implementation. Provisional - Part 2: To complete detailed design, issued for tender, issued for construction and construction administration for the interim development of the planned infrastructure outlined in the IDP. The method of Contractor Selection has not been Determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
27
Bidding Soon
516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2025

Project location map

To Be Determined, Edmonton, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.