BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2025 at 8:00 PM

Updated May 28, 2025

Demolition, site work, renovation and addition to a fire / police facility in Orrville, Ohio. Conceptual plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; for the renovation of a fire / police facility; and for site work for a fire / police facility.

The City of Orrville is seeking Statements of Qualifications from qualified Architectural and Engineering firms with respect to design services, bidding assistance, and construction administration for an expansion of Fire Station #2 located in Orrville, Ohio. Fire station #2 is located at 777 North Crownhill in Orrville, Ohio. The original building is a one-story, 1800 square feet brick building that was constructed in 1979. A 3-bay garage, conference room, and restrooms were added in 2001. The Fire Department is transitioning from a volunteer/part-time staff to a fully manned department which will require expansion for living quarters, updated restrooms, storage, showers, living room, training room, and kitchen area. The new addition will be located on the south side of the building (towards the cemetery driveway). Additional parking and drives behind the expansion will also be needed. It is desired that the exterior of the new building addition closely resemble the existing building in construction and materials. Although LEED certification is not a goal of the project, it is desired that the project incorporate LEED principals where feasible and cost effective. The selected firm will provide planning/conceptual design, cost estimating, architectural and engineering design, permitting, bidding assistance, and construction management services for the proposed project, including plans, specifications, and other construction bid documents for the City of Orrville Fire Department Station 2 addition. The services will be split into two phases. The initial planning phase will include preliminary architectural/engineering design to develop conceptual plans and preliminary cost estimating services. Upon completion of the initial planning phase of the project and securing of funding, the City will issue a Notice to Proceed for phase two for detailed design, permitting, bidding, and construction management. The current plan is to follow a traditional design-bid-build model for the project. Any questions on the specifics of the project should be directed to: Steve Wheeler Safety-Service Director 207 North Main Street Orrville, Ohio 44667 Email: swheeler@orrvilleoh.gov The City of Orrville, Ohio reserves the right to reject any and all proposals. The method of Contractor Selection has not been Determined at this time.

Conceptual

Fire / Police

$1,800,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
152
Bidding Soon
2,680
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2026

Project location map

777 N Crown Hill Rd, Orrville, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.