Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 26, 2025 at 8:00 PM
Updated June 11, 2025
This is a service / maintenance or supply contract in Gravenhurst, Ontario. Contact the soliciting agency for additional information.
Reference Number cb-711-83112430 The Correctional Service Canada (CSC) is required by law to ensure that fire protection services in CSC institutions are up to date with accurate reporting measures taken. CSC requires the services of an experienced third-party Contractor to ensure it is compliant with health and safety requirements at Beaver Creek Institution. Objectives: The Contractor must perform sprinkler inspections, fire hydrant flow tests, fire hose and cabinet inspections, and test sprinkler backflow preventers, pre-action systems and fire department connections as required under federal, provincial, and municipal legislation. The Contractor must perform the inspections, testing, maintenance and certifications annually, semi -annually and quarterly throughout the calendar year as per NFPA 25 standards. Deliverables: o The Contractor must perform inspections, testing and maintenance on the following Water Based Fire Safety Systems at Beaver Creek Institution - Minimum and Medium as per NFPA 25 standards: a) Sprinklers b) Sprinkler Back Flow Preventers c) Pre-Action Systems d) Fire Hydrants e) Fire Hose and Cabinets f) Fire Department Connections o The Contractor must provide individual deficiency reports for each inspection and testing (quarterly, semi-annual, annual) on the Water Based Fire Safety Systems at Beaver Creek Institution - Minimum and Medium as per NFPA 25 standards (Please see 3.7.1 Deficiency Reports below): a) Sprinklers b) Sprinkler Back Flow Preventers c) Pre-Action Systems d) Fire Hydrants e) Fire Hose and Cabinets f) Fire Department Connections o The Contractor must provide individual final reports for each inspection and testing (quarterly, semi-annual, annual) on the Water Based Fire Safety Systems at Beaver Creek Institution - Minimum and Medium as per NFPA 25 standards (Please see 3.7.2 Final Reports below): a) Sprinklers b) Sprinkler Back Flow Preventers c) Pre-Action Systems d) Fire Hydrants e) Fire Hose and Cabinets f) Fire Department Connections o The Contractor must supply all tools, labour, materials and mechanical devices necessary to complete all applicable inspections, testing and maintenance required to obtain certification of the Water based Fire Safety Systems at Beaver Creek Institution - Minimum and Medium. o The Contractor must identify and notify the Project Authority of any repairs required to complete the Fire Alarm System inspection and certification. The Project Authority will then arrange for any required repairs including parts and labour with the proprietary rights holder of the Fire Panel, if required. o If required, any inspection and testing that requires the OEM proprietary rights holder of the Fire Safety System (Edwards/Chubb) to participate, the Contractor is responsible for any work and associated costs for having the OEM proprietary rights holder assist in the applicable inspection and testing. o Note: The main panel is located in the MCCP area at the Medium and in the Duty Office at the Minimum. There are various panels in the institution that connect to the main panel. o The Contractor must exercise extreme care when testing units inter-connected to computer rooms and must perform this testing at the advisement and in close coordination with the Project Authority and CSC Informatics personnel. o The Contractor must ensure that all inspected systems are left in working order at the end of the contractor's workday. If the Contractor cannot leave a system in working order, the Contractor must notify the Chief of Facilities Management before the Contractor leaves the site, and the Contactor must ensure that there are alternative arrangements in place for any affected systems. o The Contractor must silence the alarm bells system during testing and return the system to operation after the inspection is complete.
Post-Bid
Jails / Prisons
Public - Federal
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2025
July 10, 2025
2000 Beaver Creek Dr, Gravenhurst, ON
Related To This Project
Gravenhurst, ON
Bid Date: Sep 06 2018
Gravenhurst, ON
Bid Date: Jul 30 2025
Gravenhurst, ON
Bid Date: Sep 04 2025
Gravenhurst, ON
Bid Date: Aug 18 2025
Gravenhurst, ON
Bid Date: Sep 18 2025
Gravenhurst, ON
Bid Date: Sep 16 2025
Gravenhurst, ON
Bid Date: Nov 19 2025
Gravenhurst, ON
Bid Date: Oct 15 2025
Gravenhurst, ON
Bid Date: May 07 2025
Gravenhurst, ON
Bid Date: May 29 2025
Gravenhurst, ON
Bid Date: Apr 29 2025
Gravenhurst, ON
Bid Date: May 01 2025
Gravenhurst, ON
Bid Date: Apr 22 2025
Gravenhurst, ON
Bid Date: Apr 28 2025
Gravenhurst, ON
Bid Date: Apr 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
