BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2025 at 8:00 PM

Updated June 11, 2025

Site work for a water / sewer project in Sauk Village, Illinois. Completed plans call for site work for a water / sewer project.

Merrill Avenue Water Main Replacement A certified check/bank draft drawn on a solvent bank or a bid bond drawn on a solvent bank, payable without condition to the Village of Sauk Village in an amount not less than ten percent (10%) of the bid shall be submitted with each proposal, as a guarantee that, if the proposal is accepted, a contract will be entered into and the performance of the contract is properly secured. A performance bond in a sum equal to one hundred percent (100%) of the amount of the bid, with sureties to be approved by the Mayor and Board of Trustees for the faithful performance of the contract, must be furnished by the successful bidder. All bids or proposals shall contain an offer to furnish bond upon acceptance of such bid or proposal. The right is reserved to reject any or all proposals, to waive technicalities, to postpone the bid opening, or to advertise for new proposals, if in the judgment of the Mayor and Board of Trustees their best interests will be promoted thereby. The Contractor will be required to pay not less than the prevailing wage rates on this project as established by the State of Illinois Department of Labor. He shall also comply with all applicable Federal and local regulations. The Village has received grant funding through the Illinois Department of Commerce & Economic Opportunity (DCEO), Grant Number 24-413039. The bidder shall submit with the Proposal a signed and completed Business Enterprise Program (BEP) Utilization Plan, which lists the firms intended to be used as MBE and WBE, the type of work or service each will perform, and the dollar amount to be allocated to each MBE and WBE. The goal of 28% has been determined with 18% of the grant dollars going to minority owned business enterprises (MBEs) and 10% of the grant dollars going to women owned business enterprises (WBEs). The individual MBE/WBE utilization goals are based on the availability of certified vendors to perform the anticipated direct subcontracting opportunities of the Utilization Plan (UP). Please note: Only subcontractors/suppliers certified through the State of Illinois' Commission on Equity and Inclusion (CEI) will count toward meeting the utilization goals for this grant. Prequalification will be required to be submitted to the Engineer by all potential bidders. If in the opinion of the Engineer and the Mayor and Board of Trustees, an applicant would not be able to serve the best interest of the Village of Sauk Village, a proposal will not be issued to the applicant.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
269
Bidding Soon
3,369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

July 10, 2025

Project location map

Merrill Ave, Sauk Village, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.