Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 27, 2025 at 8:00 PM
Updated June 11, 2025
Site work for a water / sewer project in Sauk Village, Illinois. Completed plans call for site work for a water / sewer project.
Merrill Avenue Water Main Replacement A certified check/bank draft drawn on a solvent bank or a bid bond drawn on a solvent bank, payable without condition to the Village of Sauk Village in an amount not less than ten percent (10%) of the bid shall be submitted with each proposal, as a guarantee that, if the proposal is accepted, a contract will be entered into and the performance of the contract is properly secured. A performance bond in a sum equal to one hundred percent (100%) of the amount of the bid, with sureties to be approved by the Mayor and Board of Trustees for the faithful performance of the contract, must be furnished by the successful bidder. All bids or proposals shall contain an offer to furnish bond upon acceptance of such bid or proposal. The right is reserved to reject any or all proposals, to waive technicalities, to postpone the bid opening, or to advertise for new proposals, if in the judgment of the Mayor and Board of Trustees their best interests will be promoted thereby. The Contractor will be required to pay not less than the prevailing wage rates on this project as established by the State of Illinois Department of Labor. He shall also comply with all applicable Federal and local regulations. The Village has received grant funding through the Illinois Department of Commerce & Economic Opportunity (DCEO), Grant Number 24-413039. The bidder shall submit with the Proposal a signed and completed Business Enterprise Program (BEP) Utilization Plan, which lists the firms intended to be used as MBE and WBE, the type of work or service each will perform, and the dollar amount to be allocated to each MBE and WBE. The goal of 28% has been determined with 18% of the grant dollars going to minority owned business enterprises (MBEs) and 10% of the grant dollars going to women owned business enterprises (WBEs). The individual MBE/WBE utilization goals are based on the availability of certified vendors to perform the anticipated direct subcontracting opportunities of the Utilization Plan (UP). Please note: Only subcontractors/suppliers certified through the State of Illinois' Commission on Equity and Inclusion (CEI) will count toward meeting the utilization goals for this grant. Prequalification will be required to be submitted to the Engineer by all potential bidders. If in the opinion of the Engineer and the Mayor and Board of Trustees, an applicant would not be able to serve the best interest of the Village of Sauk Village, a proposal will not be issued to the applicant.
Post-Bid
Water / Sewer
$400,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2025
July 10, 2025
Merrill Ave, Sauk Village, IL
Related To This Project
Sauk Village, IL
Bid Date: Sep 19 2025
Sauk Village, IL
--
Sauk Village, IL
--
Sauk Village, IL
Bid Date: Feb 09 2024
Sauk Village, IL
Bid Date: Dec 01 2023
Sauk Village, IL
Bid Date: Nov 10 2023
Sauk Village, IL
Bid Date: Nov 10 2023
Sauk Village, IL
Bid Date: Apr 14 2021
Sauk Village, IL
Bid Date: Mar 08 2022
Sauk Village, IL
Bid Date: Jun 16 2023
Sauk Village, IL
Bid Date: May 24 2023
Sauk Village, IL
Bid Date: Apr 12 2022
Sauk Village, IL
--
Sauk Village, IL
Bid Date: Jun 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
