Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work and paving for a transportation facility in Martinsville, Virginia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Sealed bids are hereby solicited for construction of the Runway 31 Threshold Relocation project at the Blue Ridge Regional Airport. Improvements include demolition & removal, excavation and embankment construction, new airfield pavement (asphalt), traffic management, erosion and sediment control, stormwater improvements, and other ancillary work associated with the project. The Disadvantaged Business Enterprise (DBE) goal for this project is 6.6% Question Deadline 06/12/2025 All questions concerning the project shall be submitted in writing akratzer@ardurra.com and to be given consideration must be COB. Ardurra Group is the only point through which information will be disseminated. Bid security must accompany each proposal in accordance with the Information for Bidders. No bid may be withdrawn for a period of forty-five (45) days after the opening thereof. The procedure specified under Section 2.2-4330(A) (i), VA Code Ann. shall apply The bidder shall give notice in writing of his claim of right to withdraw his bid within two (2) business days after the conclusion of the bid opening procedure". The Blue Ridge Airport Authority reserves the right to reject any and all bids, waive informalities and irregularities in bidding, and to accept bids which are considered to be in the best interest of the Authority The overall project anticipated start date is in August 2025 and entire project completion is anticipated by spring 2026. There will be one winter shutdown provided with an associated stoppage in contract time. The total contract time allowed to construct this project will be 150 consecutive calendar days. One winter shutdown is provided. The contract time is spread over two phases. Phase 1 covers work which impacts airport operations due to the need for a temporary runway threshold displacement. Phase 2 covers work outside of active runway and taxiway safety areas. Phase 1 has a completion milestone date of October 18, 2025 due to the need for the runway to be at full length for the October 26, 2025 NASCAR race at Martinsville Speedway.

Bid Results

Transportation Terminals

$3,150,762.00

Public - State/Provincial

Paving, Site Work

60

12

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
115
Bidding Soon
1,771
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2025

August 1, 2025

Project location map

525 Airport Rd, Martinsville, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.