Site work, paving and renovation of a mixed-use development in Framingham, Massachusetts. Completed plans call for the renovation of a 6,900-square-foot municipal facility; for site work for a service station / car wash facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of Framingham, through the Mayor of Framingham Massachusetts, the Awarding Authority invites sealed bids for IFB# 8704 Framingham Centralized Dispatch. The project consists of exterior and interior renovations to the existing office building and site at 188 concord street. the exterior building renovations involve improvements to the existing structural bracing and structural roof design and upgrades to the cladding, glazing, and wall and roof insulation assemblies. the interior upgrades involve renovating approximately 6,900 sf on the 3rd and 4th floors for a new regional dispatch and emergency communications center and upgrades to the common areas of the 1st and 2nd floor for accessibility. the exterior site renovations include modifications to the existing parking configuration for a new building generator, new accessible parking, and new EV charging stations. DCAMM Certification is required to bid on this project; General bid certification category is GENERAL BUILDING CONSTRUCTION The City reserves the right to reject any and all submissions, to waive any minor informalities & technicalities, or to cancel the bid if it were in the public interest The project includes upgrades to the existing exterior shell assembly, renovations to the interior common areas and tenant spaces, and reconfiguring the exterior site and parking layout at 188 Concord St. The exterior shell scope involves improvements to the existing structural bracing design and upgrades to the exterior cladding, glazing, and roof assembly. The interior scope involves renovating approximately 6,900 sf on the 3 rd and 4 th floors for a new 24/7 regional dispatch and emergency communications center for the City of Framingham, Town of Natick, and Town of Wayland as well as interior upgrades to the common areas of the 1 st and 2 nd floor. The exterior scope includes modifications to the existing parking configuration for a new generator, new accessible parking, and new EV charging stations Question Deadline 06/17/2025 No interpretation of the meaning of the Contract Documents will be given orally to any bidder. Every request for such interpretation shall be submitted through the City of Framingham's Vendor Registry portal https://vrapp.vendorregistry.com/Vendor/Register/Index/city-of-framingham-mavendor-registration And to be given consideration, must be received in Vendor registry not later than 12:00 noon, seven (7) calendar days prior to the date fixed for opening of General Bids or Sub-Bids, respectively

Bid Results

Municipal

$47,975.00

Public - City

Paving, Renovation, Site Work

119

52

20

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Quality Control, Plant Inspection Procedures, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Polychlorinate Biphenyl Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Roofing and Siding Panels, Flashing and Sheet Metal, Flexible Flashing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Plastic Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Special Wall Surfacing, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Traffic Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Pillows, Furnishing Accessories, Waste Receptacles
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Vibration and Seismic Controls for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Ducts, Duct Liners, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Decorative Metal Fences and Gates, Planting, Turf and Grasses, Plugging
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Solid Waste Control

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
172
Bidding Soon
3,198
All Active Projects
1,209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 21, 2025

img_map_placeholder

188 Concord St, Framingham, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.