Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2025 at 8:00 PM
Updated August 5, 2025
Site work for a water / sewer project in Billings, Montana. Completed plans call for site work for a water / sewer project.
The Project generally consists of the following major work items: All water installations for the project, including the 36-inch ductile iron transmission main, isolation valves, blow off valves, connection to existing distribution, and surface restoration. Bid Date Notes / The bid opening will be via Facebook Live on the City's Facebook page: Billings MT City Government. Est. Completion Date: April 15, 2026 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: All water installations for the project, including the 36-inch ductile iron transmission main, isolation valves, blowoff valves, CARV, connection to existing distribution, and surface restoration. For further information concerning this project, please contact Zak Kober, for MorrisonMaierle, Inc. at (406) 237-1255 or zkober@m-m.net; or Randy Straus, PE, Project Manager for the City of Billings at (406) 657-8301 or StrausR@billingsmt.gov.
Award
Water / Sewer
$2,863,863.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 17, 2025
August 18, 2025
4374 Hesper Rd, Billings, MT
Related To This Project
Billings, MT
Bid Date: Jun 19 2025
Billings, MT
Bid Date: Jul 15 2025
Billings, MT
Bid Date: Aug 04 2025
Billings, MT
--
Billings, MT
Bid Date: Jun 10 2025
Billings, MT
Bid Date: Jul 01 2025
Billings, MT
Bid Date: Jun 24 2025
Billings, MT
Bid Date: Jun 16 2025
Billings, MT
Bid Date: Jul 07 2025
Billings, MT
Bid Date: Jun 16 2025
Billings, MT
Bid Date: Jun 03 2025
Billings, MT
Bid Date: Jun 16 2025
Billings, MT
Bid Date: Jul 09 2025
Billings, MT
Bid Date: Jun 03 2025
Billings, MT
Bid Date: Jun 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
