Published October 24, 2025 at 8:00 PM
Updated October 25, 2025
Demolition, site work, new construction and addition to a transportation facility in Atlanta, Georgia. Completed plans call for the addition of a 4,869-square-foot transportation facility; for the demolition of a transportation facility; for the construction of a transportation facility; and for site work for a transportation facility.
Reference Number 0000398908 Question Deadline 10/03/2025 at 12:00 PM ET Questions are submitted online Yes, Information regarding the bid or bid requirements, either procedural or technical, may be obtained by submitting questions to: Purchasing Contact Name: Janett Adams Email: janett.adams@fultoncountyga.gov Phone: 404-612-7967 Bid Bond - 5 % Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Contractors License Required - Insurance Required - Prevailing Wage Required DREAM requests a construction solicitation for the new US Custom Building Project which is a part of Fulton County Airport expansion. This solicitation is subject to the Davis-Bacon Act. The new CBP facility is approximately 5,000 sq. ft., and is being designed per US CBP officials and the US CBP General Aviation Facility (GAF) 2018 Design Manual. It contains all the usual preprocessing, processing, and post processing spaces as well as office space for CBP personnel, agricultural laboratory and holding facilities as directed by CBP guidelines as directed by the CBP appointed to the project. As the project location is within the limits of an existing airport, the Contractor is expected to comply with all FAA Right of Way information as shown on the Project Safety and Phasing Plans, specifically sheets PSPN-1, PSPP-1 and EX-1. The County will approve easements if necessary and applicable. It will be the General Contractor's responsibility to provide schedule information, with adequate prior notification to the County on when these items will be so as not to impact construction activities. Each Bid be accompanied by a Bid Bond, prepared on the Bid Bond provided in this Bid Document or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety, a surety company licensed to do business in the State of Georgia by the Georgia Insurance Commissioner and listed in the latest issue of U.S. Treasury Circular 570, in the amount of five percent (5%) of the Bid. The successful Bidder for this Contract will be to furnish a satisfactory Performance and Payment Bond each in the amount of 100 percent of the Bid, and proof of insurance in accordance with the requirements set forth in Section 5 of this Bid Document. The new base building construction and finishes for the US Customs Facility at Fulton County Airport (FTY) is a part of a lager overall expansion and upgrading of the Fulton County Airport. This Customs and Border Protection facility (CBP) will be located on the northern border of the East/West Runway, on Sandy Creek Road, Atlanta, GA 30336. It is positioned to allow incoming international private jets immediate access from the nearby Taxiway. The facility is approximately 5,000 sq. ft. and has been designed in close consultation with US CBP officials and in compliance with the US CBP General Aviation Facility (GAF) 2018 Design Manual. It will contain all the usual pre-processing, processing, and post processing spaces as well as office space for CBP personnel, agricultural laboratory and holding facilities per direction of CBP personnel. The facility is designed to process as many as 4 aircrafts simultaneously and can accommodate as many as 20 occupants including staff [Insert a brief description of the project here]. The detailed scope of work and technical specifications are outlined in the Division of Work Section 01 10 00, Project Summary and Scope of Work of this bid document. PROJECT DESCRIPTION: SCOPE OF WORK This project is subject to the Davis-Bacon Act. Wage Determination information is found in the Special Conditions, Section 9. The new base building construction and finishes for the US Customs Facility at Fulton County Airport (FTY) is a part of a lager overall expansion and upgrading of the Fulton County Airport. This Customs and Border Protection facility (CBP) will be located on the northern border of the East/West Runway, on Sandy Creek Road, Atlanta, GA 30336. It is positioned to allow incoming international private jets immediate access from the nearby Taxiway. The facility is approximately 5,000 sq. ft. and has been designed in close consultation with US CBP officials and in compliance with the US CBP General Aviation Facility (GAF) 2018 Design Manual. It will contain all the usual pre-processing, processing, and post processing spaces as well as office space for CBP personnel, agricultural laboratory and holding facilities per direction of CBP personnel. The facility is designed to process as many as 4 aircraft's simultaneously and can accommodate as many as 20 occupants including staff [Insert a brief description of the project here]. The detailed scope of work and technical specifications are outlined in the Division of Work Section 01 10 00, Project Summary and Scope of Work of this bid document. The US Customs Facility/ FTY 4 is a part of a larger overall expansion and upgrading of the Fulton County Airport. The Customs and Border Protection facility (CBP) will be located on the northern border of the East/West Runway. It is positioned to allow incoming international private jet immediate access from the nearby Taxiway. The facility is approximately 5,000 sq. ft. and is being per US CBP officials and the US CBP General Aviation Facility (GAF) 2018 Design Manual. It will contain all the usual preprocessing, processing, and post processing spaces as well as office space for GBP personnel, agricultural laboratory and holding facilities per direction of CBP personnel. The facility is designed to process as many as 4 simultaneously and can accommodate as many as 20 occupants including staff.
Post-Bid
Transportation Terminals
$4,658,712.00
Public - County
Addition, Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2025
December 18, 2025
3965 Aero Dr NW, Atlanta, GA
Related To This Project
Atlanta, GA
Bid Date: Jun 12 2025
Atlanta, GA
Bid Date: Jun 16 2025
Atlanta, GA
Bid Date: Jul 08 2025
Atlanta, GA
Bid Date: Jun 17 2025
Atlanta, GA
Bid Date: Jun 16 2025
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
Bid Date: Jun 12 2025
Atlanta, GA
Bid Date: Jun 12 2025
Atlanta, GA
Bid Date: Jun 12 2025
Atlanta, GA
Bid Date: Jun 13 2025
Atlanta, GA
Bid Date: Jun 10 2025
Atlanta, GA
Bid Date: Jun 27 2025
Atlanta, GA
Bid Date: Jun 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.