Demolition, site work, paving and new construction of a bridge / tunnel in Solsgirth, Manitoba. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000294712 Question Acceptance Deadline 2025/06/10 12:00:00 PM CDT Construction of a new single span precast pre-stressed concrete box girder bridge with cast-in-place reinforced bridge deck, and concrete abutments on steel H-piles, existing bridge demolition, removal of ACROW bridge and detour, and all associated roadworks over Birdtail Creek on PTH 16, located in the SE 1/4 Sec. 2-18-26W in the Municipality of Prairie View, Province of Manitoba, Bridge Site No. 2810-10. Completion Model The Contract Will Be Assessed Liquidated Damages in Accordance With the Provisions for Liquidated Damages - Completion Specified by Completion Date. Completion Dates and Liquidated Damages Subcompletion 1 Work to Be Completed for Sub Completion 1 Includes Bridgeworks to Facilitate Paving, Gbc-i, Prime Coat and Asphalt Pavement by No Later Than October 15, 2025. Daily Liquidated Damages After the Specified Sub-completion Date Will Be Charged to the Contractor at the Rate of Two Thousand ($2,000.00) Dollars Per Calendar Day Until the Work is Completed. Subcompletion 2 Work to Be Completed for Sub Completion 2 Includes Any Remaining Work to Allow Opening to Traffic on Provincial Trunk Highway (Pth) 16 by No Later Than November 14, 2025. Daily Liquidated Damages After the Specified Sub-completion Date Will Be Charged to the Contractor at the Rate of Two Thousand ($2,000.00) Dollars Per Calendar Day Until the Work is Completed. Completion Completion of All Remaining Work, Including Shoofly Detour Removal, Seeding, Trimming, Erosion Control Blanket, and Fence Installation No Later Than December 30, 2025. Daily Liquidated Damages After the Specified Completion Date Will Be Charged to the Contractor at the Rate of Two Thousand ($2,000.00) Dollars Per Calendar Day Until the Work is Completed. The Maximum Liquidation Damage Charge at Any Given Time Shall Be Two Thousand ($2,000) Dollars Per Calendar Day Until the Work is Completed. Seasonal Shutdown The Seasonal Shutdown Date for Applicable Roadwork is: October 31 of Any Given Year. The Seasonal Shutdown Date for Applicable in-stream Work is: April 1-june 15 of Any Given Year. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Bid Results

Bridges / Tunnels

$7,381,407.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

51

3

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
5
Bidding Soon
93
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

August 14, 2025

Project location map

MB-16, Solsgirth, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.