Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 30, 2025 at 8:00 PM

Updated June 17, 2025

Site work and paving for a road / highway in Washington, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Pottery Road Improvements All prospective bidders must provide the specified bid, bid security, payment and performance bonds, and provide proof of the specified liability insurance. The Washington Special Road District reserves the right to reject any and/or all bids, and to waive any irregularities therein.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
85
Bidding Soon
1,644
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2025

July 16, 2025

Project location map

Pottery Rd, Washington, MO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed