Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work for a service station / car wash facility in Denver, Colorado. Working plans call for site work for a service station / car wash facility.

**As of August 6th, 2025, bids were canceled. No definite date for the rebid.** Reference Number 0000387873 Denver Public Schools is seeking proposals for 25 electrical bus charges with turn key installation in accordance with specifications outlined in this RFP. This purchase is funded through a Colorado Department of Public Health and Environment and Environmental Protection Agency grant, and all vendors must comply with applicable federal, state, and local procurement regulations. Question Deadline 06/09/2025 at 5:00 PM MT Questions are submitted online Yes, Inquiries regarding this solicitation must be submitted, by email to Nicole Logier, at nicole_logier@dpsk12.org. Any contact with other DPS personnel may deem the Supplier disqualified, and the proposal will not be accepted for review. The District reserves the right to reject any and all Offers or any part thereof, to waive any irregularities or informalities, and to award the Solicitation to the Supplier as deemed in the best interest of the District. SCOPE OF WORK a. b. c. d. e. f. g h. i. k. l. m. Location of ail on underground utilities Purchase of EV Chargers (equating to at least 21 ports at 30kW and 4 ports at 60 kW) I. u. iii. iv. Charger must include a 15ft cable Charger must allow for charge management software that allows for: Scheduling charging for different times of day for individual ports or chargers as a whole Transferring full charging capacity of a multi pert charger to a single port Adjustment of charging rate per port Charge port will continue to charge the battery after it reaches a full charge without reinserting the charger Purchase of associated switchgear and disconnects Connection to Xcel utility transformer (480v 750kVA) Site Drawings Charger installation Charger startup Cha rger comm ission i ng Ail wiring and conduit associated with installation Permits installation will be conducted during Xcel's utility upgrade and transformer installation and is requested to be completed as close to their project completion as possible. Xcel is scheduled to have their transformer set and completely wired by October 1 st. The Contractor must connect to the switchgear to this transformer

Final Planning

Service Station / Car Wash

$60,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
15
Bidding Soon
1,156
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

February 6, 2026

Project location map

2880 W 8th Ave, Denver, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.