Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Site work for a water / sewer project in Forney, Texas. Completed plans call for site work for a water / sewer project.

As of September 04, 2025, project was awarded to Felix Construction Company but awarded amount is not available. The North Texas Municipal Water District (NTMWD) is soliciting bids from qualified vendors for construction of one (1) new meter vault on existing treated water transmission lines. Construction will include installation of a magnetic flow meter, sleeve valve, flow conditioner, and associated appurtenances. The OPCC range for this project is $3-4M. This project is located at Allen #2 Stacy Road PS at 700 E Stacy Rd, Allen, TX 75002. Question Deadline 07/11/2025 at 2:00 PM CT All questions regarding this bid shall be submitted in writing, through ntmwd.bonfirehub.com *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK A. This Section of the Specifications describes the requirements for Communications Interface Equipment and Systems to be furnished under Division 40. B. All equipment described herein shall be submitted and furnished as an integral part of equipment specified elsewhere in these Specifications. C. Each pole shall be designed to support the antennas specified within this Section. D. The Contractor shall furnish all material, labor, transportation, design services and engineering to completely design, fabricate and erect the poles/tower, including all appurtenances, foundations and grounding systems. E. The Contractor shall be responsible to field verify the location of each pole base and the mounting height of each pole prior to installation. Pole locations shall be selected by the contractor based on close proximity to the control panel housing the radio and provide obstruction free line of sight towards the poles respective headend radio site. Each pole shall be located such that obvious obstructions are avoided along the bearings specified. Each pole location shall be subject to the approval of Owner. This approval shall be obtained after the site layout has been completed and prior to installation of the pole foundations. F. The Contractor shall develop installation and/or foundation designs for poles/tower based on an inspection of existing soil conditions at each remote site. The Contractor shall engage the services of a geotechnical firm to conduct a geotechnical investigation and submit a geotechnical report documenting the conditions. This report shall be signed by a Professional Engineer licensed in the State of Texas. G. Installation designs and foundation designs shall be submitted as part of the installation submittal. The ultimate authority and responsibility for the foundation design and installation rests with the Contractor. H. Reference the following specifications for electrical wiring work: 1. 26 05 19, "Low Voltage Electrical Conductors & Cables" 2. 26 05 26, "Ground & Bonding for Electrical Systems" Intent to Bid Due Date: Jul 23rd 2025, 2:00 PM CDT

Award

Water / Sewer

$4,180,000.00

Public - City

Site Work

139

124

9

7

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
261
Bidding Soon
3,827
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.