BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Formal-csp mooring dolphin construction for wharf 2 at care terminal. Construction of a new monopile mooring dolphin for Wharf 2 of the CARE Terminal. The project also includes the removal/demolition of two existing tripod mooring dolphins. A bid bond of 5% must be submitted with the response. Liquidated Damages for late completion. See the Special Conditions for amounts of any Liquidated Damages. The Response and all required documents shall remain valid for a period of one hundred twenty (120) calendar days after the Response Due Date. Ninety (90) calendar days calendar days from the Notice to Proceed. Question Deadline - 06/11/2025 - All technical questions and requests for clarification pertaining to the Proposal Documents shall be submitted. The Response is due, using the Port Authority' s online. For general questions regarding business with Port of Houston Authority: Procurement Services: 713-670-2461. The Port Authority reserves the right to reject any or all Responses. The Port Authority reserves the right to accept or reject any or all Responses, and waive formalities to best serve the interests of the Port Authority. Moreover, in case of ambiguity or lack of clearness in any Response, the Port Authority reserves the right to consider the most advantageous construction of, or to reject, the Response. Location of Site: The site of the proposed Work is within the Port Authority's CARE Terminal. Access to the site from I-10E: Take I-10E to Texas 8 Beltway Frontage Rd. and take the exit toward Jacinto Port Blvd. Turn left onto Jacinto Port Blvd., keep right onto San Jacinto Blvd. and proceed onto 16800 Peninsula St. The project site will be at the eastern end of Wharf 2. See Exhibit B. The Work will be performed in a secured/restricted area. All employees, workers, and Subcontractors of Contractor must be in possession of a valid TWIC identification and must comply with all other Port Authority access and security rules

Award

Water / Sewer

$738,895.00

Public - City

Site Work

18

11

15

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
9
Bidding Soon
2,555
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2025

July 18, 2025

Project location map

16800 Peninsula St, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.