Site work for a civil project in Oak Creek, Wisconsin. Completed plans call for site work for a water / sewer project.

**As of August 19th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Description: The project contemplated consists of the replacement of two centrifugal basin drain pumps (basin drain pump 1 and basin drain pump 3) and associated equipment. The equipment is located within Secondary Control Building 5 (Building 331) and Secondary Control Building 6 (Building 332) of the South Shore Water Reclamation Facility (SSWRF). The selected Contractor shall undertake the following for this project: - Remove and dispose of basin drain pump 1 (located in Building 331) and basin drain pump 3 (located in Building 332). - Remove and dispose of the pump motors and baseplates. - Remove and dispose of the 12-inch knife gate valves in the suction side of each pump. - Remove and dispose of the air release valves on the discharge side of each pump. - Remove and dispose of the 12-inch check valve located on the discharge side of basin drain pump 3. - Remove the basin drain pump reinforced concrete equipment pads. - Furnish and install new 12-inch knife gates valves on the suction side of each pump. - Furnish and install new air release valves on the discharge side of each pump. - Furnish and install a new 12-inch check valve on the discharge side of basin drain pump 3. - Form and place new reinforced concrete equipment pads in the location of basin drain pumps 1 and 3. - Furnish and install two new pump baseplates. Epoxy coat the new baseplates prior to installing the new pump equipment. - Furnish and install two new basin drain pumps, flexible couplings, and electrical motors on the new baseplates. - Connect, align, and balance the new motors and pumps. - Complete 7-day test run for each of the new pumps and valves. - Complete all other work described in the Specifications and as necessary to complete the project. Project Location- South Shore Water Reclamation Facility Question Deadline 06/23/2025 - All questions related to this proposed Contract, pre-bid presentation, site tour (if offered) or interested bidders list must be directed in writing to Millie Neidhardt at eneidhardt@mmsd.com, no later than 3 days before the bid opening date. September, 2025 Notice to Proceed (Commission Approval) Contract Completion 365 calendar days after Notice to Proceed

Bid Results

Water / Sewer

$526,035.00

Public - County

Site Work

4

26

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
5
Bidding Soon
2,173
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.