Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 10, 2025 at 8:00 PM
Updated July 11, 2025
Site work for a civil project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.
Question Deadline 07/03/2025 All questions related to this proposed Contract, pre-bid presentation, site tour (if offered) or interested bidders list must be directed in writing to Nathan Churchill, at nchurchill@mmsd.com, no later than 7 days before the bid opening date. A site tour will be held at the project site at 9:00 a.m. on July 17th, 2025. The project contemplated consists ofreplacement offive large-diameter magnetic flow meters and associated equipment. The equipment is located in two separate buildings ofthe Jones Island Water Reclamation Facility (JIWRF): the Influent Flow Meter Vault (Building 204) and the Disinfection Flow Meter Vault (Building 245). Additionally, the project consists ofreplacing flexible pipe couplings, replacing 84" butterfly valves with spool pieces, removing four unused chlorine dosing pipes, adding reinforcing steel to support existing foot traffic platforms, removing four concrete meter supports, and installing four new concrete pipe supports. The Contract consists ofthe following work in general. Influent Flow Meter Vault (Building 204) Excavate concrete hatch ofvault (gravel and asphalt removal), relocate hatch to gain crane access. Complete lead paint abatement ofthree pipelines in vault wall-to-wall. Remove three magnetic flow meters (two 72-inch and one 90-inch). Remove nine flexible couplings (six 72-inch and three 90-inch). Remove three existing magnetic flow meter signal transmitters from the Preliminary Treatment Facility (Building 203). Replace all fastening hardware (nuts and bolts) of all flanges in all three pipelines. Furnish and install three magnetic flow meters (two 72-inch and one 90-inch). Furnish and install nine flexible couplings (six 72-inch and three 90-inch). Furnish and install three magnetic flow meter signal transmitters in the Influent Flow Meter Vault. Surface prep and coat all three pipelines in vault wall-to-wall. Manufacturer training, startup, functional acceptance testing, and operational acceptance testing of each new flow meter system. Reseal vault with existing concrete access hatch, apply thermal/moisture protection, cover hatch with backfill, and lay asphalt as originally positioned. Complete description is available in the Invitation to Bid portion of the contract documents. Replace five large diameter flow meters and other inline flow elements in two underground vaults at Jones Island. Scope also includes lead paint abatement and recoating. Long lead times are anticipated for flow meters; 6-9 months. Work will take place in critical plant process areas, will be restricted to winter months and may require two winters to complete.
Bid Results
Water / Sewer
$2,359,238.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
September 29, 2025
To Be Determined, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Jun 09 2025
Milwaukee, WI
Bid Date: Jun 13 2025
Milwaukee, WI
Bid Date: Jul 01 2025
Milwaukee, WI
Bid Date: Jul 21 2025
Milwaukee, WI
Bid Date: Jul 18 2025
Milwaukee, WI
Bid Date: Jul 08 2025
Milwaukee, WI
Bid Date: Jun 11 2025
Milwaukee, WI
Bid Date: Jun 17 2025
Milwaukee, WI
Bid Date: Jun 12 2025
Milwaukee, WI
Bid Date: Jun 10 2025
Milwaukee, WI
Bid Date: Jun 18 2025
Milwaukee, WI
Bid Date: Jun 18 2025
Milwaukee, WI
Bid Date: Jun 19 2025
Milwaukee, WI
Bid Date: Jun 12 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
