BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work for a civil project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

Question Deadline 07/03/2025 All questions related to this proposed Contract, pre-bid presentation, site tour (if offered) or interested bidders list must be directed in writing to Nathan Churchill, at nchurchill@mmsd.com, no later than 7 days before the bid opening date. A site tour will be held at the project site at 9:00 a.m. on July 17th, 2025. The project contemplated consists ofreplacement offive large-diameter magnetic flow meters and associated equipment. The equipment is located in two separate buildings ofthe Jones Island Water Reclamation Facility (JIWRF): the Influent Flow Meter Vault (Building 204) and the Disinfection Flow Meter Vault (Building 245). Additionally, the project consists ofreplacing flexible pipe couplings, replacing 84" butterfly valves with spool pieces, removing four unused chlorine dosing pipes, adding reinforcing steel to support existing foot traffic platforms, removing four concrete meter supports, and installing four new concrete pipe supports. The Contract consists ofthe following work in general. Influent Flow Meter Vault (Building 204) Excavate concrete hatch ofvault (gravel and asphalt removal), relocate hatch to gain crane access. Complete lead paint abatement ofthree pipelines in vault wall-to-wall. Remove three magnetic flow meters (two 72-inch and one 90-inch). Remove nine flexible couplings (six 72-inch and three 90-inch). Remove three existing magnetic flow meter signal transmitters from the Preliminary Treatment Facility (Building 203). Replace all fastening hardware (nuts and bolts) of all flanges in all three pipelines. Furnish and install three magnetic flow meters (two 72-inch and one 90-inch). Furnish and install nine flexible couplings (six 72-inch and three 90-inch). Furnish and install three magnetic flow meter signal transmitters in the Influent Flow Meter Vault. Surface prep and coat all three pipelines in vault wall-to-wall. Manufacturer training, startup, functional acceptance testing, and operational acceptance testing of each new flow meter system. Reseal vault with existing concrete access hatch, apply thermal/moisture protection, cover hatch with backfill, and lay asphalt as originally positioned. Complete description is available in the Invitation to Bid portion of the contract documents. Replace five large diameter flow meters and other inline flow elements in two underground vaults at Jones Island. Scope also includes lead paint abatement and recoating. Long lead times are anticipated for flow meters; 6-9 months. Work will take place in critical plant process areas, will be restricted to winter months and may require two winters to complete.

Bid Results

Water / Sewer

$2,359,238.00

Public - County

Site Work

16

35

8

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
151
Bidding Soon
1,944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

September 29, 2025

Project location map

To Be Determined, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.