Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 22, 2025 at 8:00 PM
Updated October 23, 2025
Site work, paving, new construction and addition to an educational facility in Tulsa, Oklahoma. Completed plans call for the expansion of a post-secondary education facility.
OSU Medical Center Pharma & Med Sciences - Bid Package #5 (New Facility) Project Construction has started but Flinto is only rebidding the Operable Partitions Package and a traffic signals package. Anticipated Bid Packages to be issued via CM Clarification: 05-03A - Concrete 05-04A - Masonry 05-05A - Structural Steel 05-05E - Ornamental Stairs and Handrail 05-05J - Unistrut System 05-06B - Millwork 05-07A - Waterproofing 05-07B - Roofing 05-07C - Metal Panels 05-07H - Sprayed Fireproofing 05-07L - Expansion Joint Assemblies 05-08C - HM Doors, Frames & Hardware 05-08E - Wood Doors 05-08H - Overhead Doors 05-08L - Aluminum & Glazing 05-09A - Drywall 05-09G - Flooring 05-09J - Terrazzo 05-09L - Epoxy Flooring 09T - Painting 05-10B - Signage 05-10C - Toilet Acc. & Fire Ext. 05-10D - Toilet Compartments 05-10G - Flagpoles 05-10H - Lockers 05-10L - Visual Display Boards 05-10M - Operable Partitions 05-11A - Foodservice Equipment 05-11B - Residential Appliances 05-11I - Window Washing System 05-11O - Loading Dock Equipment 05-11P - Sterilizers 05-11Q - Bio Safety Cabinets 05-11Z - Lab Casework 05-12B - Window Treatment 05-14A - Elevators 05-21A - Fire Protection 05-23A - Mechanical 05-26A - Electrical 05-27A - Structured Cabling 05-27C - Nurse Call System 05-27E - Intercom & Clock System 05-28A - Fire Alarm 05-28B - Security & Access Control 05-32A - Landscaping & Irrigation 05-32B - Fences & Gates 05-32C - Asphalt Paving **Do not submit bids through Online. This is a public project and bids will need to be submitted in a sealed envelope as directed below.** All bids are to be sealed and CLEARLY labeled by describing the project and indicating the package being bid on the envelope as described in the Instructions to Bidders. A Bid Security, as stipulated in the bid documents, in the amount of 5% of the bid shall accompany the sealed proposal of each bidder if the amount of the bid exceeds $50,000. Please contact John Bonner (jbonner@flintco.com) or Kyle Rhine (kyle.rhine@flintco.com) with Flintco at (918) 587-8451 with any questions about bid procedures or documents. All Bidders for this project are required to meet all qualification requirements as established in these bid documents. Upon receipt of an acceptable bid, the contract will be awarded within thirty (30) days after opening bids and the written contract executed within sixty (60) days thereafter. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Educational
$115,000,000.00
Public - County
Addition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2025
December 1, 2025
744 W 9th St, Tulsa, OK
Related To This Project
Tulsa, OK
Bid Date: Jul 25 2025
Tulsa, OK
Bid Date: Jul 11 2025
Tulsa, OK
Bid Date: Jun 27 2025
Tulsa, OK
Bid Date: Jul 11 2025
Tulsa, OK
Bid Date: Jul 11 2025
Tulsa, OK
Bid Date: Jun 19 2025
Tulsa, OK
Bid Date: Jun 19 2025
Tulsa, OK
Bid Date: Jul 25 2025
Tulsa, OK
--
Tulsa, OK
--
Tulsa, OK
Bid Date: Jun 17 2025
Tulsa, OK
Bid Date: Jun 13 2025
Tulsa, OK
Bid Date: Jun 11 2025
Tulsa, OK
Bid Date: Jun 11 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
