Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 2, 2025 at 8:00 PM
Updated June 3, 2025
Site work and paving for a sidewalk / parking lot in Nashua, New Hampshire. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Construction of the North HS, including the access drive, parking lots, fire lanes and drop off loops, was completed in 2002. The pavement is now showing its age, with settling, cracking, displaced curbing, etc. At the recommendation of the City's Engineering office, the school department hired Stantec in 2018 to conduct an assessment of the site and provide a proposed repaving/mitigation program. Their estimate at that point was in excess of $1.5million. We have escalated that figure to the current budget year and added an amount for additional degradation we have witnessed. $300,000 in existing deferred maintenance funds have been allocated to initiating the pavement restoration. We reviewed site conditions this past summer with the City's Engineering Department and identified a number of areas where the pavement has "failed". Working with Mark Saunders, Deputy City Engineer, we developed a game plan to best utilize the $300,000, which will restore pavement in the access/loop roads in the front of the school. We will utilize DPW's pavement company to accomplish this work the summer of 2025. Remaining to be addressed after this summer are the front, rear and satellite parking lots and the fire lane/access road wrapping around the rear of the school. The amount requested is my estimate of the remaining work and has not been vetted by the City Engineer's office. Funding Source City Funds - Bonds, Capital, Trust Funds, etc. Alignment with Master Plan Goals and Capital Planning Best Practices Critical Maintenance of Existing Infrastructure Status of Request w/ CIC Existing/Carry-Over/Partially Funded Previously Eisenhower Matrix Quadrant Important, but Less Urgent As of June 2, 2025, this project is included in the City's 2026-2031 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Sidewalks / Parking Lot
$1,725,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
8 Titan Way, Nashua, NH
Related To This Project
Nashua, NH
--
Nashua, NH
--
Nashua, NH
--
Nashua, NH
--
Nashua, NH
Bid Date: Jun 09 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
