Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 7, 2025 at 8:00 PM
Updated August 8, 2025
Site work for a bridge / tunnel in Bozeman, Montana. Completed plans call for site work for a bridge / tunnel.
The scope of this project is to deliver the bridge items needed to install a new trail bridge, Horseshoe Creek, on the Custer Gallatin National Forest on the Beartooth Ranger District. BASE ITEMS: Contractor shall provide both sills and all (20) diaphragms, (See attached drawings for dimensions), remove and dispose of the old existing sills, and install the stringers, sills, diaphragms and all fasteners for these items. This contract includes delivering other Government furnished material to bridge location, which includes stringers, decking, curb, wearing surface material, and other applicable hardware. The Government will provide all material except Sills and Diaphragms. Government furnished material will be available at the Meyers Creek Administration site upon request. OPTION ITEMS: Option items will be for complete bridge installation to be able to open the bridge up to the public. These optional items include deck, curb, running planks, and applicable hardware installation, approach work, and new trail ion to tie the trail into the new bridge approaches. Approach grades shall be no steeper than 30. Approach work does include gabion basket installation on the North approach. Gabion baskets are available onsite to aid in approach ion and minimize embankment. Gabion baskets not used in the approach work shall be returned to Meyers Creek Site. ion Magnitude: 100,000 - 250,000. The date and time for offers to be submitted is changed to 06/30/2024 5:00 EDT. Questions for this project will be allowed until June 20, 2025 at 1700 EDT The estimated Period of is expected to begin August 1, 2025 and end no later than September 15, 2026. Questions for this project will be allowed until June 20, 2025 at 1700 EDT. No questions will be allowed after this date. Answers will be posted to SAM.gov under this solicitation number within three (3) business days. All questions should be forwarded to Karen Carleton at karen.carleton@usda.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$134,615.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2025
August 1, 2025
10 E Babcock St, Bozeman, MT
Related To This Project
Bozeman, MT
--
Bozeman, MT
--
Bozeman, MT
--
Bozeman, MT
--
Bozeman, MT
--
Bozeman, MT
Bid Date: Jun 26 2025
Bozeman, MT
Bid Date: Jun 25 2025
Bozeman, MT
Bid Date: Jun 27 2025
Bozeman, MT
--
Bozeman, MT
Bid Date: Jun 26 2025
Bozeman, MT
Bid Date: Jun 16 2025
Bozeman, MT
Bid Date: Jun 17 2025
Bozeman, MT
Bid Date: May 18 2025
Bozeman, MT
Bid Date: May 19 2025
Bozeman, MT
Bid Date: May 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
