Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 15, 2026 at 8:00 PM
Updated May 19, 2026
Site work, paving and new construction of a mixed-use development in Charleston, South Carolina. Working plans call for the construction of a two-story above grade military facility; and for site work for a military facility.
SPECIAL NOTICE: The U.S. Army Corps of Engineers (USACE) Louisville District intends to solicit proposals for the constructing of an Aeromedical Evacuation Squadron (AES) Training Building at Joint Base Charleston, SC. As part of the contract solicitation, the Government intends to include the following sole source requirements: Interior Finishes: The contract solicitation will include a brand name or equal requirement for finishes, such as paint, carpeting, and window coverings to complete or enhance the aesthetic experience of interior and exterior parts of a building. These finishes include colors, patterns, textures and textile designs. HVAC: The contract solicitation will include a sole-source brand requirement for Trane Heating, Ventilation, and Air Conditioning (HVAC) equipment in the construction of new facilities at Joint Base Charleston. The agency head has determined in accordance with the agency's standardization program that only specified makes and models of technical equipment and parts will satisfy the agency's needs for additional units or replacement items. Fire Alarm Panel/Transmitter: The contract solicitation will include a sole-source brand requirement for Monaco BT-XM radio transmitter which is the only transmitter that will communicate with the systems at JB Charleston and is the only transmitter that is compatible with the current JB Charleston infrastructure. Design-bid-build construction of a new 23,701-square-foot Aeromedical Evacuation Squadron Training Building to support the 315th Airlift Wing. The facility will be constructed in accordance with AFRC Handbook 32-1001 Standard Facility Requirements (18 October 2023) and the user-requested program of spaces. The building will provide a large open administrative area with supporting spaces including conference and break rooms, private offices, teaming areas, a lactation room, restrooms with lockers, classrooms and training rooms, an auditorium, and required mechanical and electrical support spaces. Construction features include deep pile foundations, concrete slab-on-grade, brick veneer exterior, reinforced masonry walls, structural steel framing, standing seam metal roofing, and installation of an elevator. Building systems will include exterior lighting, electrical distribution, fire detection and fire protection systems, mass notification, and communications infrastructure. Site work includes access improvements, parking areas, sidewalks, and storm water management systems. The project also includes all required utilities, controls, supporting facilities, and incidental work necessary to deliver a complete, functional, and usable training facility. The contract duration is anticipated to be 730 calendar days from issuance of the Administrative Notice to Proceed. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$100,000,000.00
Public - Federal
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 27, 2026
To Be Determined, Charleston, SC
Related To This Project
Charleston, SC
Bid Date: Jul 10 2025
Charleston, SC
Bid Date: Jun 13 2025
Charleston, SC
Bid Date: Jun 18 2025
Charleston, SC
Bid Date: Jul 09 2025
Charleston, SC
Bid Date: Jun 11 2025
Charleston, SC
--
Charleston, SC
--
Charleston, SC
Bid Date: Jul 15 2025
Charleston, SC
Bid Date: Jun 26 2025
Charleston, SC
Bid Date: Jun 10 2025
Charleston, SC
Bid Date: Jun 26 2025
Charleston, SC
Bid Date: Jun 23 2025
Charleston, SC
Bid Date: Jun 24 2025
Charleston, SC
Bid Date: Jun 04 2025
Charleston, SC
Bid Date: Jun 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
