Site work for a water / sewer project in Edmonton, Alberta. Completed plans call for site work for a water / sewer project.
The Work includes the installation of two PRV stations, two isolation valves and one hydrant in the French Creek distribution system. The Work includes, but is not limited to, the following: .1 Pressure Control Stations 1 and 2 .1 Installation of a new pressure control station (PCS) that houses PRVs, strainers. electromagnetic flow meter, water sampling pipe, valves and stainless-steel piping in an above ground metal kiosk. The new PCS will be built with the following: .1 Complete metal kiosk structure with concrete slab foundation and separate electrical cabinet. .2 All 316L stainless steel process piping to the exterior of the building footprint. .3 PVC water distribution and supply pipe to/from the PCS and connecting to the watermains within the roadway. .4 PRVs, flow meter, pressure transducers and appurtenances for a complete operational system. .5 All mechanical heating, fans and lights. .6 All electrical, controls (for process and mechanical equipment), starters, instrumentation for a complete operational system. .7 Electrical service connection. .8 Structural concrete pad. .9 Kiosk floor drain drained to ditch. .10 All water piping related to the PCS function, valves, and connection to existing supply and distribution mains in the roadway. .11 All site work including unsuitable material removal and backfills, common excavation rough grading, sub-base, base-course, paving, finished grading, excavation and trenching. .12 Bollar and no post barriers for vehicle protection. .13 Commissioning and testing all equipment and controls. .14 Programming coordination related to the PCS function including programming of the RTU and HMI. .15 Supply of a complete operation and maintenance manual. .16 Connection to existing mains in the roadway. Contractor will coordinate connections directly with EPCOR Operations staff. Isolation valve 1 and 2 installation. Documents can be obtained from https://epcor.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/ce4b8b8f-f7ee-4cc3-9326-d3a4f3972e2a Question Deadline Wed Jun 25, 2025 2:00:00 PM (MDT)
Post-Bid
Water / Sewer
$700,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2025
August 8, 2025
Multiple Locations, Edmonton, AB
Related To This Project
Edmonton, AB
Bid Date: Jun 06 2025
Edmonton, AB
--
Edmonton, AB
--
Edmonton, AB
Bid Date: Jul 07 2025
Edmonton, AB
--
Edmonton, AB
Bid Date: Jun 19 2025
Edmonton, AB
Bid Date: Jun 24 2025
Edmonton, AB
Bid Date: Jun 13 2025
Edmonton, AB
Bid Date: Jun 24 2025
Edmonton, AB
Bid Date: Jun 18 2025
Edmonton, AB
Bid Date: Jun 12 2025
Edmonton, AB
Bid Date: Jun 17 2025
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.