BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

This is a service / maintenance or supply contract in March Air Reserve Base, California. Contact the soliciting agency for additional information.

Western Water already has a successful SCADA network topology system operating at the WRCRWA treatment plant. This project is based on designing a SCADA network topology where all of the existing RTU devices at the WWRF treatment plant can transmit field data to a primary PLC and a secondary PLC. Below are some of the key issues for this project: a. Evaluate the feasibility of retrofitting existing RTU panels at WWRF to match the configuration and layout of WRCRWA's RTU panels. If retrofitting is not viable, design recommendations shall include new RTU panel replacement. b. Design and integrate a primary and secondary programmable logic controller (PLC) to receive data from all RTUs across the facility. This dual-PLC setup is required to establish a redundant control and data acquisition architecture. c. Design and implement a fiber optic network connecting each treatment process building's RTU to both primary and secondary PLCs to support a fully redundant RTU and SCADA network topology. d. Implement Western's latest SCADA programming standards and software platform at WWRF to ensure consistency, maintainability, and alignment with current operational practices. e. Assess and design relocation and rewiring of the exciting PLC panel in the WWRF Operations building to the current server room using the existing server rack, with consideration for electrical and conduit modifications. Other Details Western Water received a Congressionally Directed Spending (formerly known as Earmarks) Grant Fund for the design and construction of this project. This project will be subjected to: 1. Federal Davis-Bacon Prevailing Wages 2. Build America, Buy America (BABA) 3. American Iron and Steel Consultant shall evaluate the feasibility of implementing BABA & American Iron and Steel requirements into the project. If requirements are not feasible, help Western Water obtain the necessary waivers. Notes] Contact Info Gull Nawaz 951-571-7238 gnawaz@wmwd.com. Question Deadline 06/19/2025 at 4:00 PM PT Online Q&A Yes. Type of Award Lump Sum The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
1
Bidding Soon
1,811
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 29, 2025

Project location map

22751 Nandina Ave, March Air Reserve Base, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.