EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2025 at 8:00 PM

Updated June 13, 2025

Renovation of a mixed-use development in Cokato, Minnesota. Completed plans call for the renovation of a educational facility.

The Owner invites proposals on the forms attached hereto, all blanks of which must be appropriately filled in for the Project identified as: Dassel-Cokato Public Schools, The Project to include Existing Firewall Improvements. Dassel-Cokato Public Schools 4852 Reardon Ave SW Cokato, MN 55321 Proposals shall be emailed or submitted on the printed forms furnished, including Alternates and Unit Prices. All blank spaces in the forms shall be filled in correctly with ink or typewritten, and the completed forms shall be without inter-lineation or alteration. A contractor's proposal should include all pages of the proposal form. Proposal amounts shall be stated both in writing and numerals, and if discrepancies exist the written amounts shall take precedence. Proposals shall be signed in longhand. If the bidder is a co-partnership, the signature shall be that of a partner and the names and addresses of all partners shall be listed on the form. If the bidder is a corporation, the signature shall be that of an authorized officer, and the corporate seal shall be affixed to the form. The proposal shall include all material, labor, equipment, insurance, taxes, transportation, inspection fee, permits, access fees, services and means necessary and incidental to complete the work in accordance with the Contract. Each proposal must be emailed or submitted in a sealed envelope bearing on the outside the name of the bidder, their address, and the name of the project, and proposal packages for which a proposal is included. If sent by mail, the sealed envelope containing the proposal must be enclosed in another envelope addressed as specified on the Proposal Form. (Note: Contractors Own Terms, Qualification, Conditions and Other Attachments if Attached to or Sent With the Proposal Proposal, Shall Not Be Accepted as Part of the Proposal). Proposals shall be emailed, mailed or submitted in person. Proposals received after the time set for receipt of proposals will not be considered and will be returned to the bidder unopened. No oral, telegraphic, or telephonic proposals or modifications will be considered. The Owners reserves the right to accept or reject any or all proposals, or parts of proposals, and to waive informalities therein. For the purposes of determining the lowest responsible bidder(s) in the consideration of all proposals submitted, the Owners reserves the right to accept or reject any or all alternates, in any order or combination, which appear on the Proposal Form and as it may consider in the best interests of the Owners. For all Contracts in excess of $20,000.00 each successful prime contract bidder shall furnish Performance and Payment Bonds in the full amount of the contract. Each proposal in excess of $20,000.00 shall be accompanied by a proposal security of 5% of the maximum amount of the proposal in the form of a Surety Bond, certified check, cashier's check. Prevailing wage requirements are not required The Owner reserves the right to provide work by their own forces or by separate contract associated with the project simultaneously with construction work included in Contract. The Contractor shall coordinate use of the space with the Owner and Construction Manager to complete all work to meet the project schedule. The Owner anticipates being able to award a contract as quickly as possible from proposal opening. The preliminary schedule is to start construction as soon as possible in June 2025 and complete for back to school 2025. Contractors shall coordinate work with the Owner to meet the schedule as required.

Post-Bid

Educational

$100,000.00

Public - City

Renovation

19

13

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Execution
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Portland Cement Plastering, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Utilities

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
64
Bidding Soon
980
All Active Projects
384
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

July 14, 2025

img_map_placeholder

4852 Reardon Ave SW, Cokato, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.