Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work for a water / sewer project in Saint Louis, Missouri. Completed plans call for site work for a water / sewer project.

Ingram Barge Company, formerly SCF Lewis & Clark Terminals, owns and operates a Rail-to-Barge transfer facility on the Mississippi River in St. Louis, MO, called the Tyler Street Terminal (the "Terminal"). The Terminal is planned for demolition and replacement as part of a Federal Grant project. The Tyler Street Terminal is a multi-purpose fertilizer and grain export terminal that is primarily used for potash and other fertilizers with a projected annual tonnage of 2.0 to 3.0 million short tons per year ("MTPY"). The primary commodities for Tyler Street are red and white potash, and KMag secondary commodities include, but may not be limited to, corn, wheat, soybeans, HRW, and SRW in varying tonnages (175,000 TPY total grain). The Materials Handling System ("MHS") design shall consider the handling characteristics of the identified commodities to minimize chute wear and chances of plugged chutes, minimize dust emissions and spillage, minimize deterioration due to corrosion when handling corrosive commodities, and address the explosive potential of handling grain products with combustible dust. The project will involve removing the existing system and providing engineering, procurement, and construction of a new, turnkey material handling system, and will be subject to prevailing wage rates. The attached bid packet details the project, but consider an overview of its elements below. Demolition of Existing Facility Rail Receiving Shed Engineering & Construction Gate Opener Equipment & Installation Conveyor Engineering, Equipment & Installation Transfer Tower Engineering, Equipment & Installation Dust Collection System Equipment & Installation Sampling System Equipment & Installation Contractor Supplied Crane and Barge for Demolition, Staging, and Installation Questions shall be submitted via email to Keith.McDonough@ingrambarge.com before 3:00pm (local time) on June, 26, 2025.

Award

Water / Sewer

$14,123,021.00

Public - City

Site Work

8

11

19

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
126
Bidding Soon
1,676
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

September 1, 2025

Project location map

Tyler St, Saint Louis, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed