Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2026 at 8:00 PM
Updated March 18, 2026
Site work and paving for a sidewalk / parking lot in Dallas, Texas. Completed plans call for paving for a sidewalk / parking lot; and sidewalk / parking lot.
The intent of the Contract Documents is for the Contractor to provide for construction and completion, in every detail, of the Work described or reasonably inferable therefrom. It is further intended that the Contractor shall furnish all necessary superintendence, labor, machinery, Equipment, tools, Materials, transportation and supplies required to complete the Work in accordance with the Plans, Specifications, and all other terms of the Contract Documents. Any failure or neglect on the part of Owner to enforce provisions dealing with supervision, control, inspection, testing, or acceptance and approval of the Work shall never relieve Contractor from full compliance with the Contract Documents nor render the Owner liable to the Contractor for damages, extensions of time, or increased compensation of any kind. The Contract Documents contain instructions and descriptions covering the construction and workmanship necessary for building and completing the various units or elements of the Work. The Contract Documents are intended to be so written that only first class material, workmanship, and finish of the best grade and quality will result. The fact that the Contract Documents may fail to be so complete as to cover all details will not relieve the Contractor of full responsibility for providing a completed Project of high quality, first class finish and appearance, and satisfactory for operation, all within the intent of the Contract Documents. Accordingly, the Contractor shall supervise and direct the Work using in a good and workmanlike manner, in accordance with the professional and other standards imposed by applicable laws and the Contract Documents, using the Contractor's best skill and attention, and shall in all cases act in the Owner's best interests and act in good faith in connection with the Work. The Contractor shall be solely responsible for, and have control over, construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the Work. The Contractor shall be responsible for inspection of portions of Work already performed to determine that such portions are in proper condition to receive subsequent Work. Design professionals, e.g., architects, engineers, and similarly licensed professionals, shall perform their part of the Work in accordance with the professional skill and care ordinarily provided by competent engineers, architect, or other applicable professionals practicing under the same or similar circumstances and professional license, and as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer, architect, or other applicable professional. South Remote Parking Lot Expansion Small Business Enterprise (Sbe) Goal: 20% Questions Due Date Feb 13th 2026, 4:00 PM CST Additional Information is Available on the Dfw International Airport Website at The Dfw Airport, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.s.c. 2000d to 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. Intent to Bid Due Date: Mar 6th 2026, 2:00 PM CST South Remote Parking Lot Expansion Small Business Enterprise (Sbe) Goal: 20% Additional Information is Available on the Dfw International Airport Website at The Dfw Airport, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.s.c. 2000d to 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. Intent to Bid Due Date: Mar 6th 2026, 2:00 PM CST
Bid Results
Sidewalks / Parking Lot
$10,184,048.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2026
May 5, 2026
2400 S Airfield Dr, Dallas, TX
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
