BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2025 at 8:00 PM

Updated July 12, 2025

Site work and paving for a bridge / tunnel in Campbellton, New Brunswick. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

PSPC has a requirement for the furnishing of all plant, labour, equipment, and materials for the minor substructure repairs to the J.C. Van Horne Bridge, located between Campbellton, NB and Listuguj / Pointe-à-la-Croix, QC. All elements of the work must be completed within 22 weeks of award. The estimated cost of this procurement is between $1,000,001 to $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$1,498,859.00

Public - Federal

Paving, Site Work

34

29

10

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
3
Bidding Soon
115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

August 28, 2025

Project location map

Multiple Locations, Campbellton, NB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.