Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Site work and paving for a civil project in Hortonville, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The Project includes the following Work: John St: Mill and repave approximately 3,200 SY of asphalt pavement. Fountain Court: mill and repave approximately 1,450 SY of asphalt pavement, install 500 of storm sewer (6-inch and 8-inch). Work also includes erosion control, traffic control and site restoration. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with the wage rate established by local wage rates. Owner reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the Village Of Hortonville. Doc Note : Online requires the bidding documents to be downloaded from the site in order to submit a bid in the Vbid system. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through Online . Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than Website.
Bid Results
Water / Sewer
$247,435.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 19, 2025
September 1, 2025
Multiple Locations, Hortonville, WI
Related To This Project
Hortonville, WI
Bid Date: Dec 09 2025
Hortonville, WI
Bid Date: May 15 2025
Hortonville, WI
Bid Date: May 05 2025
Hortonville, WI
Bid Date: Sep 12 2024
Hortonville, WI
Bid Date: Jul 29 2024
Hortonville, WI
Bid Date: Jul 11 2024
Hortonville, WI
Bid Date: Jun 27 2024
Hortonville, WI
Bid Date: Apr 25 2024
Hortonville, WI
Bid Date: May 14 2024
Hortonville, WI
Bid Date: Apr 04 2024
Hortonville, WI
Bid Date: Apr 03 2024
Hortonville, WI
Bid Date: Apr 04 2024
Hortonville, WI
Bid Date: Jul 30 2019
Hortonville, WI
Bid Date: Apr 03 2024
Hortonville, WI
Bid Date: Feb 13 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
