Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Site work, paving and renovation of a mixed-use development in Belle Vernon, Pennsylvania. Completed plans call for the renovation of a multi-residential development; for site work for a multi-residential development; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
As of July 18, 2025, the project was awarded to the following: Maxim Construction got PC-$183,000.00 MC-$259,000.00 EC-158,000.00 Costabile Construction got GC- 398,500.00 Total awarded amount is $998.500. This project involves the renovation and upgrading of existing furnaces, water heaters and exteriors at the Marion Villa Apartments under the direction of the Fayette County Housing Authority. Interior Mechanical, Plumbing & Electrical Work Removal and replacement of furnaces and air handlers with new units and associated ductwork, gas piping, exhaust piping, and thermostats. Replacement of hot water heaters with updated units, including new gas and water piping connections. Installation of GFCI outlets throughout units. New shut-off valves on the main water supply (base quantity of 25), with provision for add/deduct pricing. Exterior Renovation Work Painting and caulking of building panels, trim, porch ceilings, downspouts, masonry sheds, and storage area doors/frames. Repointing and replacement of brick across the site. Concrete replacement includes sidewalk, porch slabs, and reconstruction of selective stair sets. Installation and painting of new and existing metal handrails. Installation of new house numbers on unit fronts and backs. Price of these plans is non-refundable. Each bid must be accompanied by a bid bond, certified check, or bank cashier's check payable to the Fayette County Housing Authority in the amount of ten percent (10%) of the bid amount. Bids shall be addressed to the Fayette County Housing Authority, 624 Pittsburgh Road, Uniontown, Pa. 15401. Envelopes containing bids shall be sealed and clearly marked "Sealed Bid" with the "Project Title", and "Contract Number" and "Date and Time" for receipt of bids. The Fayette County Housing Authority reserves the right to reject any or all bids and to waive informalities in bidding. No bid shall be withdrawn for a period of sixty (60) days subsequent to the opening without the consent of the Authority. The successful bidder will be required to furnish and pay for a satisfactory Performance and Payment Bond. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, national origin or age. In addition, the Contract will be under the requirements of Executive Order #11625 relative to new goals and timetables and Section III of the Housing and Urban Development Act of 1968 and where applicable. The Fayette County Housing Authority solicits and encourages Minority Business Enterprise (MBE) participation. MBE's will be afforded full consideration of their responses and will not be subjected to discrimination. Bidders will be required to comply with the Authority's MBE Program Goal requirements where applicable. Bid result - General Construction - Costabile Construction - $ 398,500.00 Mechanical - Maxim Construction - $ 259,000.00 Plumbing - Maxim Construction - $ 183,000.00 Electrical - Maxim Construction - $ 158,000.00
Award
Multi-Residential
$998,500.00
Public - County
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2025
August 11, 2025
4 Marion Villa, Belle Vernon, PA
Related To This Project
Belle Vernon, PA
Bid Date: Jul 14 2025
Belle Vernon, PA
Bid Date: Nov 13 2025
Belle Vernon, PA
--
Belle Vernon, PA
Bid Date: May 21 2025
Belle Vernon, PA
Bid Date: May 23 2025
Belle Vernon, PA
Bid Date: May 23 2025
Belle Vernon, PA
Bid Date: May 14 2025
Belle Vernon, PA
Bid Date: Apr 17 2025
Belle Vernon, PA
--
Belle Vernon, PA
Bid Date: Mar 13 2025
Belle Vernon, PA
Bid Date: Feb 17 2025
Belle Vernon, PA
Bid Date: Sep 09 2024
Belle Vernon, PA
Bid Date: Sep 18 2024
Belle Vernon, PA
Bid Date: Apr 26 2024
Belle Vernon, PA
Bid Date: Apr 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
