BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Renovation of a mixed-use development in Philadelphia, Pennsylvania. Completed plans call for the renovation of a educational facility; and medical facility.

Temple intends to renovate the entire 3rd floor of the Park Ave Pavilion of approximately 22,400 square feet for a new Intensive Care Unit ("ICU"). The existing Labor and Delivery unit will be relocating to the Women and Families Campus, component 30 in 2025. This renovation includes 22 ICU private patient rooms with toilets, decentralized nurse stations, 2 soiled utility rooms, 2 clean supply rooms, a family waiting room, 2 medication rooms, a nutrition area, equipment storage rooms and alcoves, workrooms for staff, 4 staff offices, 2 on-call room suites, a large staff education room, a staff lounge, lockers, toilets, meditation and mother's rooms, Environmental Services, Information Technologies Services and other required support spaces. Windows will be added to a portion of the west exterior wall to provide the required natural light in all patient rooms. Temple also intends to renovate the existing Cardiac Catherization (Cath) Lab #3 of approximately 4,900 square feet for a new Cardiac Cath Lab. The renovation will consist of adding a new 15,500 CFM AHU in the Ancillary Building penthouse to replace existing abandoned AHU-12. The selected Contractor, if any, will be required to institute required ICRA barriers and procedures and interim life safety measures as required during the work to provide safe conditions for all workers, staff and clients. Question Cuttoff Date & Time 9/22/2025 02:00:00 PM (ET) This Project will be subject to a Delegation Agreement between Temple, the Pennsylvania Department of General Services and the Governor's Office of the Budget. This Project will be a multi-prime project delivered pursuant to a multi-prime contract delivery structure. The Prime Contractors will include, at a minimum: General Construction, Mechanical-HVAC, Electrical, and Plumbing and Fire Protection, and each other contractor engaged directly by Temple to perform construction or supply machinery, materials, equipment or labor for construction of the Project and which are identified by Temple as being a Prime Contractor for the Project. Electrical Scope The Scope of Work for the Electrical Package shall include all necessary services, work, labor, material, supervision, tools, supplies, equipment, insurance, applicable taxes necessary to complete Electrical Package as shown in the Contract Documents for the above referenced Project. The Scope of Work for the Electrical Package is further specified in the Agreement, the Scope of Work (including all Schedules thereto), the Plans and Specifications, and other documents that will be uploaded to TU ebid as part of the solicitation. The Electrical Package is tentatively scheduled to be released for bid on or around June 30, 2025 with bids to be due on July 30, 2025. Duration: 18 months. *Please be sure to review all Project Insurance Requirements in the Specs! *As a reminder, please submit your bid in the following format: a) Bid for ICU b) Bid for CCU c) Breakout Phases 1, 2, 3 and 4 of the CCU Bid Result: Base Bid 1 - Lex Electric Inc., Inc. $3,369,040.00 Base Bid 2 - Lex Electric Inc., Inc. $4,091,540.00

Bid Results

Medical

$7,460,580.00

Public - State/Provincial

Renovation

223

71

38

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
20
Bidding Soon
4,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

October 31, 2025

Project location map

3401 N Broad St, Philadelphia, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.