Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and paving for a road / highway in Middleton, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Work Includes the Construction of: Asphalt Street Surface Crack Filling, Chip Sealing and Surface Sealing. The City is Flexible on Scheduling This Work, Intended to Be Pursued Sometime Between July 15 and September 30, With Completion Within 30 Calendar Days of Starting. Work May Not Be Pursued on August 20-24 Because of Good Neighbor Festival Weekend]. There Will Be No Pre-bid Conference for This Project No Bid Will Be Received Unless Accompanied by a Surety in a Form Acceptable to the City Equal to at Least 5% of the Maximum Bid, Payable to the Owner. The City of Middleton Reserves the Right to Reject Any or All Bids, To Waive Any Technicality, and to Accept Any Bid Which It Deems Advantageous. All Bids Shall Remain Subject to Acceptance for 85 Days After the Time Set for Receiving Bids (Consisting of Up to: 60 Days for Issuance of Notice of Award; 15 Days for Contractor to Return Signed Agreements, Bonds and Insurance; and 10 Days for City Execution of Agreement).

Award

Roads / Highways

$249,942.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
74
Bidding Soon
1,906
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

July 15, 2025

Project location map

Multiple Locations, Middleton, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed