BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Site work for a water / sewer project in Joint Base Pearl Harbor-Hickam, Hawaii. Working plans call for site work for a water / sewer project.

Project proposes to repair Ammunition Wharves W3 and Wl by strengthening existing bearing piles, adding new bearing piles, retaining part of the existing fender pile system, and replacing the deck to create wharves built to current standards. The project will be divided two phases with W3 in fiscal year FY22 and Wl in FY23. The wharves shall meet the requirements of Unified Facilities Criteria (UFC) 4-152-01, 11 Design: Piers and Wharves. 11 The wharf structure will be able to support a uniform live load of 600 psf as well as the unrestricted movement of 90-ton mobile truck cranes with maximum outrigger loads limited to 80 tons. Scope of work for each phase is identical. Scope includes demolition of the existing wharf deck. A portion of the existing bearing piles will be repaired and new bearing piles will be installed to accommodate the greater design load A portion of the existing fender system, consisting of pre-cast concrete piles and plastic wales and chocks, will be replaced. Sheet piling will be installed inboard of the wharf structure. The project will also include the reconstruction of wastewater and potable water utility systems, phone lines and grounding system for lightning protection. Utilities will be placed into a utility trench built into the wharf deck. Permanent oil spill containment boom, safety ladders, life ring cabinets, fire alarm system and mooring hardware will be installed. This project proposes to repair Ammunition Wharves W3 & Wl by strengthening existing bearing piles, adding new bearing piles, retaining part of the existing fender pile system, and replacing the deck to create wharves built to current requirements of Unified Facilities Criteria (UFC) 4-152-01, "Design: Piers and Wharves. (Current Mission) Requirement: The repair of wharves Wl and W3 will provide long-term capabilit ... NOTE: description has been truncated, please see Project Note for full description. Est. Value Min: $7,500,000 Max: $50,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$100,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
0
Bidding Soon
116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

Project location map

To Be Determined, Joint Base Pearl Harbor-Hickam, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.